Similar Projects
Precast Concrete Headwalls
Post-Bid

Northwest Stormwater Study 611721-100000
Post-Bid
Columbus, OH

Second Avenue Storm Sewer Improvements 611707-100000
Results
Less than $700,000 est. value
Columbus, OH

2020 Sustainable Sewer Solution
Results
Less than $1,352,405 est. value
Upper Arlington, OH

Jacking and Boring Services
Post-Bid

Mink Pressure District Water Main Improvements and Harrison Road Storm Sewer Improvements
Results
Less than $3,450,000 est. value
New Albany, OH 43054

Street Resurfacing and Sewer System Improvements
Post-Bid
Valleyview, OH

Holton Park and Eureka Avenue Green Infrastructure Improvements
Results
Columbus, OH

Wastewater BMP Cleanout
Post-Bid
Columbus, OH 43215

2020 Storm and Sanitary Improvements
Results
Less than $196,002 est. value
Marble Cliff, OH

Fabrication and Delivery of Precast Box Culverts and Wingwalls
Infrastructure
Post-Bid
Less than $176,300 est. value
OH

Mound Street Floodwall and W. Col. Protection 611708-100000
Results
Columbus, OH

Drain Systems Cleaning and Repair
Results
Columbus, OH

Ridpath Road Over Stanford Smith Ditch (Jac-Tr270-0.69)
Results
Less than $276,561 est. value
Columbus, OH

Cosgray Ditch Phase 1
Results
Less than $1,375,000 est. value
Dublin, OH

Last Updated 07/26/2021 03:09 AM
Project Title

2021 Alley Drainage Improvement Project: Hickory Alley Storm Sewer

Physical Address View project details and contacts
City, State (County) Groveport, OH 43125   (Franklin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $379,715
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of existing pavements and drainage structures and pipe along the alley-ways, and placement of approximately 1,050 lineal. ft. of storm sewer pipe, ranging from 4-inch diameter underdrain, to 15-in., 18-in., up to 48-in. diameter, placement of about 13 storm structures, mill and reconstruction of alley pavements requiring the placement of approximately 25 c.y. of asphalt pavement, and 330 s.y. of concrete pavement along with other miscellaneous work.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents