Similar Projects
City of Kingston Pedestrian Safety Action Plan
Term Contract
Post-Bid
NY

River Road Drainage
Results
Less than $560,000 est. value
Esopus, NY 12429

Where and When Structures Repair
Results
Less than $4,700,000 est. value

Construction of Saugerties Culverts Program
Results
Less than $790,000 est. value
Saugerties, NY 12477

Construction of Reservoir Protection
Results
Less than $235,000 est. value
Saugerties, NY 12477

Preventive Maintenance including Paving, Striping, Drainage Work
Results
Lloyd, Marlborough, NY 12542

Bushkill Stream and Stream Bank Rehabilitation Watson Hollow Road
Results
West Shokan, NY 12494

Big Pond Road Culvert Replacement
Results
Less than $625,000 est. value
Hardenburgh, NY

Scale Replacement and Drainage Improvements at the Ulster County Recycling Center
Results
Less than $320,000 est. value
Kingston, NY 12402

Replacement of DeSilva Road and Upper Boiceville Road Culverts over Unnamed Creek
Results
West Shokan, NY 12494

Floodwall Repairs - Ellenville
Results
$250,000 to $500,000 est. value
Ellenville, NY

Cured-In-Place Pipelining - Term Construction Contract 7
Results

Culvert Job Order Contract: NYSDOT Region 8
Results
$1,200,000 est. value

Replace Various Culverts on Route 44/55 and 17K
Results
$1,300,000 est. value
Crawford, Gardiner, NY

New York Rising, Governor’s Office of Storm Recovery (GOSR), Village of Ellenville/Town of Wawarsing, Stream Restoration Project
Results
Ellenville, NY

Reported 05/08/2021 12:00 AM
Project Title

Warner Creek at WC-1 & Wc-2 River Restoration Project

Physical Address View project details and contacts
City, State (County) Chichester, NY 12416   (Ulster County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The contract consists of the stabilization of two bank failures along Warner Creek (WC) adjacent to Silver Hollow Road at two adjacent sites referred to as WC-01 and WC-02. It will involve approximately 300 linear feet of channel reconstruction at WC-01 and 400 linear feet of channel reconstruction at WC-02, including the creation of a bankfull shelf and floodplain bench, vegetated stream bank stabilization, riparian buffer and willow plantings, and channel bed restoration. A combination of hardening approaches with softer bioengineering and natural vegetative restoration measures will be used. Proposed bank and floodplain stabilization techniques include live-staked boulder revetment, rootwad and woody debris placement, willow brush layering, brush mattress, and willow fascine installation, riprap lined drainage swale with buried wood reinforcement, and full landscaping and site restoration with topsoil, seed, trees, and shrubs. In-stream structures associated with the channel reconstruction will include installation of boulder riffle structures, random boulder clusters, random channel roughness and timber-reinforced boulder deflector vanes.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents