Similar Projects
SR211 at Cedar Creek Road Intersection Improvement - County of Barrow
Infrastructure
Conception
$2,500,000 CJ est. value
Winder, GA 30680

SR211 at Cedar Creek Road Intersection Improvement - County of Barrow
Infrastructure
Conception
$2,500,000 CJ est. value
Winder, GA 30680

Patrick Mill Rd / Harbins Rd at Apalachee River 3.6 Mi S of Carl
Demolition, New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Winder, GA 30680

Patrick Mill Rd / Harbins Rd at Apalachee River 3.6 Mi S of Carl
Demolition, New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Winder, GA 30680

2022 L.M.I.G. and Non L.M.I.G. Roadway Patching and Resurfacing
Infrastructure
Bidding
$200,000 CJ est. value
Winder, GA 30680

2022 L.M.I.G. and Non L.M.I.G. Roadway Patching and Resurfacing
Infrastructure
Bidding
$200,000 CJ est. value
Winder, GA 30680

Pavement Rehabilitation-Building H Parking Area and Raymond Kelley Drive
Infrastructure
Post-Bid
Milledgeville, GA

Runway 10/28 Crack Seal and Re-Marking
Infrastructure
Post-Bid
Nashville, GA 31639

I-85 Widening Phase III
Results

Realignment of Chow Road
Results
$258,956 est. value
Alma, GA

North Bartow Interchange Feasibility Study (New I75 interchange) - Bartow County
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Cartersville, GA 30120

North Bartow Interchange Feasibility Study (New I75 interchange) - Bartow County
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Cartersville, GA 30120

Dirt Road Paving - Joseph Griggs Road - Barrow County
Infrastructure
Conception
$300,000 CJ est. value
Winder, GA 30680

SR 29 BU/US 441bu at Fishing Creek in Milledgeville
Demolition, New Construction, Infrastructure
Design
$8,000,000 CJ est. value
Milledgeville, GA 31061

Signing and Pavement Marking
Infrastructure
Bidding
$300,000 CJ est. value
Elmodel, GA 39870

Last Updated 12/06/2022 08:39 AM
Project Title

Crack and Joint Seal, Pavement Asphalt Surface Treatment (Seal Coat P608R) Runway 10-28 and 3,900 SY T-hangar Taxiways, and Remark Airfield

Physical Address View project details and contacts
City, State (County) Metter, GA 30439   (Candler County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $328,090 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of furnishing all plant, labor, equipment, and materials and performing all work in strict accordance with the plans and specifications for: Crack and Joint Seal, Pavement Asphalt Surface Treatment (Seal Coat P608R) Runway 10-28 & 3,900 SY T-hangar Taxiways, & Remark Airfield The location of the work is at the Metter Municipal Airport, Metter, Georgia. Prospective bidders should read the following instructions carefully before submitting their bids. For each item on the bid form there is a space provided for the price to be shown in numerals and words. All notations must be in ink. Totals read at the opening of bids are not guaranteed to be correct and no final award of contract will be made until the bid and extensions have been verified. A Bidder's bond must be executed on the form furnished by the Owner, and the required bond, cash, cashier's check, or certified check must accompany each bid, in the amount of five (5%) percent of the total amount of the bid. A 100% performance bond and a 100% payment bond will be required of the Contractor at time of contract execution. A Georgia Resident Agent must countersign all bonds from a surety company authorized by law to do business in this State pursuant to a current certificate of authority to transact surety business by the Commissioner of Insurance; no bond shall be approved unless the surety is on the United States Department of Treasury's list of approved bond sureties. The successful bidder will be required to provide the Owner with the affidavit required by OCGA 36-91-21(e), Competitive Awards Requirements, and OCGA 13-10-91, Contractor and Subcontractor EEV/Basic Pilot Program Affidavit. All work under the contract shall be completed within FORTY-FIVE (45) CALENDAR DAYS from the Notice to Proceed. Payment will be made monthly on completed work. Retainage will be held by the Owner to a maximum of ten percent (10%) of each progress payment. The Owner reserves the right to award the contract deemed to be in the best interest of the Metter Candler County Airport Authority. Liquidated damages for the delay in completion, and/or exceeding runway closure time, will be EIGHT HUNDRED DOLLARS ($800.00) per calendar day. Envelopes containing bids must be sealed, addressed to the undersigned, and marked as follows: "Bid for Construction at Metter Municipal Airport, Candler County, Georgia. Croy Engineering Project 1122.015." Bids will be required to remain open for acceptance or rejection for ONE HUNDRED AND TWENTY (120) calendar days after the date of opening of bids. The following regulations and requirements apply to this project: Buy American Preferences (Title 49 United States Code, Chapter 501) Foreign Trade Restriction: Denial of Public Works contracts to suppliers of goods and services of countries that deny contracts to suppliers of goods and services of countries that deny procurement market access to U.S. contractors (DOT Regulation 49 CFR Part 30). Government wide debarment and suspension and government wide requirements for drug free workplace. DOT Regulation 49 CFR Part 29) Davis-Bacon Act (DOL Regulation 29 CFR Part 5) Affirmative Action to Ensure Equal Employment Opportunity (Executive Order 11246 and DOL Regulation 41 CFR Part 60) DBE OBLIGATION. A DBE goal of 8.15% has been set for this project. The Metter - Candler County Airport Authority, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The bidder must have at his disposal the necessary equipment to put on the project when notice is given to begin work and to do the work within the time specified. The proposal of any bidder will be rejected if the award of the work for which the proposal is submitted, may, in the judgment of the Owner, affect the workmanship, financing or progress of other work awarded to the bidder in the same letting or other work which the bidder may have under contract. The right to reject any or all bids and to waive informalities is reserved to the owner. Copies of the plans, specifications and bid forms are on file at the Office of the Metter Candler County Airport Authority located at 700 Washington Street, Metter, Georgia 30439; and the Engineer, CROY ENGINEERING, LLC, 200 North Cobb Parkway, Building 400, Suite 413, Marietta, GA 30062. They may be examined at these offices without charge.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents