Similar Projects
Underground Storage Tanks Removal and Replacement
Bidding
Southgate, MI

1,500 Gall Fuel Dispenser
Post-Bid
Gwinn, MI

FY20 Sault Magazine Feeder 4 Repair
Post-Bid
Sault Sainte Marie, MI 49783

SAR Ken`S Party Store - UST Removal
Results
Harrison, MI

Waste Oil Removal
Term Contract
Results
Detroit, MI

Dye Sodium Hypochlorite Tank Procurement
Post-Bid
Lansing, MI

Fuel Facility Relocation and Expansion
Results
Less than $591,000 est. value
Hillsdale, MI

BP 5 Transportation Access Road and Fuel Tank
Post-Bid
Southfield, MI

Chemical Pumps
Results
Less than $86,931 est. value
Detroit, MI

Fuel Pump Repairs
Post-Bid
Dearborn, MI

Fuel Dispensing System at the Educational Service Center
Results
Less than $905,362 est. value
Clinton Township, MI

2020 Wastewater Treatment Plant Bulk Chemicals
Post-Bid
Ypsilanti, MI

Fuel Tank Replacement Project
Results
Ann Arbor, MI

Propane & Tanks
Post-Bid
Wayne, MI

Sault Tribe Housing Authority - Odenaang Natural Gas Conversion
Results
Less than $64,885 est. value
Sault Sainte Marie, MI

Last Updated 09/17/2020 11:55 AM
Project Title

Chemical Storage Tank Repair - Leib CSO Facility

Physical Address View project details and contacts
City, State (County) Detroit, MI 48226   (Wayne County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Repair of Internal Fiberglass Liner of Chemical Storage Tanks #1 & #2 at Leib CSO Facility. Removal of existing tank lining, if necessary, and to an extent as determined by the lining installer, as well as repair of any corroded or degraded tank materials. Replacement and installation of any necessary structural material removed. Restoration of the interior lining of the tanks up to an adequate height to repair all leaks and any significant defects. Hydrostatically testing the repairs. Coordination of installation with the Tank Inspection Consultant, GHD, to perform a pre-inspection prior to installing the liner and a post installation general inspection. Project management activities including CPM (Critical Path Methods) to produce a detailed schedule of activities. Clean-up, disposal of all waste, including potentially hazardous material, and de-mobilization activities to return GLWA facilities to a condition free fromequipment, debris and waste produced during construction activities. Acceptance of final site conditions must be approved by a GLWA representative prior to close-out. All other work as indicated on the Contract Drawings and Specifications and/or work as otherwise necessary for a complete and functional Hypochlorite storage tank.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents