Similar Projects
Gwinnett Street Widening
Results
Savannah, GA

Phase I Entrance Road
Results
Savannah, GA 31400

Jekyll Island Road Resurfacing
Results
Jekyll Island, GA 31527

Southern Region Disaster Recovery Support BPA
Results

Last Updated 02/18/2020 02:06 PM
Project Title

Milledgeville Streetscape - Phase IV

Physical Address View project details and contacts
City, State (County) Milledgeville, GA   (Baldwin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The focus of the project is the removal and replacement of existing concrete sidewalk running parallel to a length of Greene, Wilkinson, and McIntosh Streets with new brick-banded concrete walkways to update the area and give it a modern aesthetic. In addition, concrete and asphalt driveways will be replaced as well as new landscaping, electrical, and lighting introduced to the area. Roadway striping along parking spaces will be re-painted and several new storm sewer structures introduced. Finally, a concrete retaining wall and stairwell will be constructed on the south side of McIntosh Street near its intersection with Wayne Street.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents