Similar Projects
2022 Sanitary Sewer Relining
Infrastructure
Bidding
$86,000 est. value
Hanover Park, IL

Sewer Main Improvements
Infrastructure
Bidding
$480,000 est. value
Oak Park, IL

Playfield Subdivision Phase 3 Sanitary Sewer Rehabilitation
Post-Bid
Crestwood, IL

2021 Water and Sewer Improvements
Post-Bid
Streamwood, IL

Sanitary Sewer Improvements
Results
$1,000,000 to $5,000,000 est. value
Matteson, IL 60423

River Siphon and Chamber Lining
Results
IL

Greenwood Stormwater Basin
Post-Bid
Niles, IL 60714

Sanitary Sewer Cleaning and Televising Services
Results
Berkeley, IL

Emergency Watermain and Sewer Services
Post-Bid
Park Ridge, IL

2021 Sanitary Sewer Lining Program
Results
Less than $280,000 est. value
Burbank, IL

Sewer and Water Maintenance and Repair
Term Contract
Post-Bid
Schaumburg, IL

Catch Basin Repair Goethe ES
Results
Chicago, IL 60647

2021 Sewer Lining Program
Post-Bid
$3,250,000 est. value
Westchester, IL

2021 Bartlett Sanitary Service Lining
Results
Bartlett, IL

10500 Grand Avenue Redevelopment
Post-Bid
Franklin Park, IL 60131

Last Updated 06/03/2022 12:35 AM
Project Title

2022 Sanitary Sewer Rehabilitation

Physical Address View project details and contacts
City, State (County) Indian Head Park, IL   (Cook County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $420,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of the rehabilitation of approximately 1,843 linear feet of 8-inch to 10-inch sanitary sewer through lining and all associated work. Other items of work include 2 locations of system point repairs due to sewer separations, cutting protruding taps, sewer flow control, traffic control and protection, sealing and adjusting manhole frames, post-construction televising inspection, final restoration, and all incidental and collateral work necessary to complete the project as shown on the Plans and described herein. All work is to be substantially completed within 90 calendar days of notice to proceed.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents