Similar Projects
HVAC Upgrades to West Virginia State Office Building Nos. 5, 6, & 7
Renovation
Design
$50,000 CJ est. value
Charleston, WV 25301

HVAC Equipment Maintenance and Repair Service
Term Contract
Sub-Bidding
Nitro, WV 25143

HVAC Filters
Term Contract, Alteration
Post-Bid
Charleston, WV 25302

Judicial Building HVAC Renovation Phase I
Alteration
Post-Bid
Charleston, WV 25301

Replacement of Piping Insulation - Air Handling Units 1, 2, 3 and 4
Alteration
Results
$50,797 est. value
Charleston, WV 25311

Building 11 Chiller Wall Repair
Alteration
Results
Charleston, WV 25305

Provide & Install a New Gas Boiler in the Kanawha County Courthouse
Addition, Demolition, New Construction, Build-out, Renovation
Construction
$301,000 CJ est. value
Charleston, WV 25302

Direct Purchase of HVAC Equipment
Alteration
Post-Bid
WV

HVAC Preventive /Corrective Maintenance and Parts
Alteration
Results
Charleston, WV 25301

15 Ton Heat Pump
Alteration
Post-Bid
South Charleston, WV

Building 6 Air Handler
Infrastructure
Results
Charleston, WV

Sharon Dawes Elementary - HVAC Replacement and Renovation
Renovation
Post-Bid
$700,000 CJ est. value
Eskdale, WV 25075

HVAC Renovations of a MLK and North Charleston Rec Centers
Alteration
Results
Charleston, WV 25301

Inspection and Cleaning of Kitchen Hoods
Term Contract
Post-Bid
Charleston, WV

HVAC Work
Alteration
Results
Cross Lanes, WV

Last Updated 01/27/2023 10:38 AM
Project Title

HVAC Replacement and Renovation for Sissonville Elementary School

Physical Address View project details and contacts
City, State (County) Sissonville, WV 25320   (Kanawha County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $2,892,958 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of HVAC replacement and renovation at Sissonville Elementary School. Replacement to include demolition/removal of existing mechanical HVAC systems to include units, piping, ductwork, etc. as required for installation of new HVAC systems. Demolition to include removal and replacement and repair of existing rooftop equipment and roofing as required for installation of new systems. The scope of work will also include replacement of HVAC equipment and related roof curbs as well as final connections. New digital temperature controls shall also be provided to tie into the district wide controls. Refer to contract documents for detailed scope description and contract requirements. Included within this project shall be window replacements and exterior door and frame replacement and casework where indicated. This project is a rebid and includes deletion of Geothermal System. Replacement HVAC Equipment design is based off Root Top units. Questions Due Date: Dec 6th 2022, 4:00 PM EST

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents