Similar Projects
Last Updated | 06/24/2023 05:34 AM |
Project Title | RFP- Professional Engineering Consultant Services for the Project Development and Environmental (PD&E) Study of the Northeast Connector Expressway Phase 2 Project |
Physical Address | View project details and contacts |
City, State (County) | Orlando, FL 32801 (Orange County) |
Category(s) | Single Trades |
Sub-Category(s) | Service/Term Contracts |
Contracting Method | Competitive Bids |
Project Status | Construction start expected January 2024 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Central Florida Expressway Authority (CFX) requires the services of a Professional Engineering Consultant in connection with Contract No. 002025, Project Development & Environment (PD&E) Study for the proposed Northeast Connector Expressway Phase 2 Project located within Osceola County Florida. Disadvantaged/Minority/Women/Business Enterprises will not be discriminated against on the basis of race, color, sex, or national origin in consideration for qualification or an award by CFX. CFX has established a 15% participation objective for D/M/WBE firms for each project. Central Florida Expressway Authority (CFX) requires the services of a Professional Engineering Consultant in connection with Contract No. 002025, Project Development & Environment (PD&E) Study for the proposed Northeast Connector Expressway Phase 2 Project located within Osceola County Florida. Shortlist consideration will be given to only those firms who are qualified pursuant to law, and as determined by CFX, based on information provided by the firms, and who have been pre-qualified by FDOT to perform, as a minimum, the indicated Major Types of Work. Firms are advised that requests made for project information and files must be made through the CFX Contact Person shown below. Any violation of this requirement will be grounds for rejection of a submittal made in response to this notice. MAJOR TYPES OF WORK: As a minimum, the consultant shall be prequalified by FDOT in the following work groups: 2.0 Project Development and Environmental Studies. The method of Contractor Selection has not been Determined at this time. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |