Similar Projects
Sunview/Telfair Storm Drainage Improvement Project - City of Charlotte
Infrastructure
Conception
$3,745,000 CJ est. value
Charlotte, NC 28202

Dixie Berryhill Water and Sewer Projects - City of Charlotte
New Construction, Infrastructure
Conception
$3,920,000 est. value
Charlotte, NC

Hilton Garden Inn / Steele Creek
New Construction, Infrastructure - 90,000 SF
Design
$20,700,000 CJ est. value
Charlotte, NC 28202

Freedom Greene
New Construction, Infrastructure
Design
$65,000,000 CJ est. value
Charlotte, NC 28208

Discovery Place Nature (Prequalification Phase)
New Construction, Infrastructure - 25,832 SF
Sub-Bidding
$41,447,692 CJ est. value
Charlotte, NC 28209

RFQ D/B - Stowe Regional Water Resource Recovery Facility
Addition, Infrastructure
Post-Bid
$200,000,000 CJ est. value
Charlotte, NC 28205

RFQ D/B - Stowe Regional Water Resource Recovery Facility
Addition, Infrastructure
Post-Bid
$200,000,000 CJ est. value
Charlotte, NC 28205

Mcalpine WAS Equalization Improvements
New Construction
Results
Pineville, NC 28134

Unspecified Site Preparation for Pre-Construction Utility Relocations
Term Contract
Results
$500,000 est. value
Charlotte, NC

LakePointe
New Construction, Infrastructure
Construction
$156,000,000 CJ est. value
Charlotte, NC 28208

The Park-Huntersville Industrial Building
New Construction, Infrastructure - 159,120 SF
Construction
$85,000,000 CJ est. value
Huntersville, NC 28078

Birkdale Golf Club Mixed Use
New Construction, Infrastructure - 68,188 SF
Pending Verification
$45,000,000 CJ est. value
Huntersville, NC 28078

Randolph Road Medical Office Building
New Construction, Infrastructure - 117,000 SF
Pending Verification
$68,000,000 CJ est. value
Charlotte, NC 28207

McDowell Wastewater Treatment Plant - Capacity Enhancement and Rehabilitation Project - City of Charlotte
Renovation
Conception
$51,000,000 est. value
Huntersville, NC 28078

Harris Self Storage
New Construction, Infrastructure - 95,000 SF
Design
$10,000,000 CJ est. value
Charlotte, NC 28227

Last Updated 12/13/2022 02:06 PM
Project Title

Mallard Creek WRF Improvements Phase I

Physical Address View project details and contacts
City, State (County) Charlotte, NC 28262   (Mecklenburg County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Questions must be directed to the contact shown above and will be conveyed to all bidders. Questions must be submitted by 12:00PM on 11-Nov-2022. PC/Leeper Joint Venture has been selected by Charlotte Water as the construction manager for the Mallard Creek Water Reclamation Facility Phase 1 Improvements project in Charlotte, North Carolina. This project includes process air and liquid and solids process train improvements that will allow the facility to expand from its current 12-mgd capacity to 14.9 mgd. Liquid process train improvements include a new influent pumping station, new flow equalization facilities, new alkalinity storage and feed facilities, and plant drain piping improvements for centrate equalization. Work to the solids process train includes modifications to the solids handling building, including new process equipment, and supporting electrical and controls systems. PC/Leeper will work with engineers Brown and Caldwell and CDM Smith on this project. Construction is expected to begin in late 2022 with completion scheduled for January 2027. Please read the attached Invitations to Bid for more project information. Bid Package 13.01 Equalization Facilities Bid Package 15.25 Biosolids Handling Bid Package 15.30 Balance of Facilities For questions please contact Melinda Lindsay PC-Leeper, A Joint Venture 7085 Old Plank Rd. Stanley, NC 28164 T: 704.291.6371 F: 802.419.5024 E: mlindsay@pcconstruction.com

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents