Similar Projects
Opus Green
New Construction - 2,200 SF
Design
Millcreek, UT 84107

SLCo Parleys Trail 900 W to Jordan River Trail
Infrastructure
Bidding
$4,500,000 to $5,000,000 est. value
Salt Lake City, UT 84129

Playgrounds
New Construction
Bidding
$190,000 est. value
Riverton, UT 84096

Sunnyvale Park Improvements
Post-Bid
$300,000 to $400,000 est. value
Millcreek, UT

Pickleball Court Construction Project
Post-Bid
Sandy, UT 84070

Herriman High Track Resurface
Results
$400,000 to $500,000 est. value
Herriman, UT 84096

Heritage Park Splash Pad - Construction Management / General Contractor Services
Results
South Jordan, UT 84095

Bout Time Pub and Grub
New Construction, Renovation
Pending Verification
Sandy, UT 84070

Storm Mountain Tennis Court
New Construction
Bidding
Sandy, UT

Columbus Park Playground
Post-Bid
Salt Lake City, UT 84115

Playground Pit Upgrade
Term Contract
Results
Less than $230,000 est. value
Herriman, Riverton, South Jordan, West Jordan, UT 84084

Old Farm Park - Splash Pad Refurbish
Post-Bid
Less than $160,000 est. value
Riverton, UT 84065

Basketball Court Resurfacing
Results
Riverton, UT

Playgrounds
Post-Bid
Less than $60,000 est. value
Riverton, UT

Jordan and Liberty Park Flowers
Results
Salt Lake City, UT

Last Updated 11/02/2021 01:27 PM
Project Title

Construction of the Prospector Park Project

Physical Address View project details and contacts
City, State (County) Cottonwood Heights, UT   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes furnishing all labor, tools, materials, equipment, transportation, and services required for the construction of the below described project, located in Cottonwood Heights. Consists of the following items of work: mobilization, clearing and grubbing, traffic control; all required earthwork; construction of concrete trail and concrete pads, concrete edger, concrete curb, asphalt trail, limestone trail, and soft surface trail; placing limestone crusher fines; landscape boulders; installing benches, trash receptacles, pet waste stations, drinking fountain, and dog wash station; installing wood rail fencing and gates, chain link fencing, and hand railing; construction of limestone trail; construction of drainage improvements including detention basins, pipes, sumps, and rip rap; installation of utilities including water line to park for drinking fountain, dog wash station, and irrigation system; construction and installation of park entry monument, park sign, and wayfinding markers; installation of landscaping and irrigation; and all appurtenant work;

Details

Park/Playground, New Construction.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents