Similar Projects
Reported | 05/13/2022 12:00 AM |
Project Title | Main Play Structure |
Physical Address | View project details and contacts |
City, State (County) | Dover, NH (Strafford County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Park/Playground |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected June 2022 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Main Play Structure: To be equal to or comparable with Superior Recreational drawing attached in bid documents 3.5 O.D. vertical post minimum Minimum 3 slides Minimum 1 hex deck and roof Minimum 1 climbing wall Minimum 5 climbers ADA accessible 5-12 age group Fall height not to exceed 8 Example must meet main playground structure of 5 ground level play activities and 5 activity types 15 elevated play activities User capacity 47 minimum Accessory Items: Arch swing to have minimum 3.5 O.D post with 5-12 seats At least 1 of 2 Spinners to be inclusive Compliance Certification: ASTM F1487- and CPSC 325 or IPEMA certified compliance certification for all equipment upon request Galvanized Fencing: Fencing to be 6 tall commercial grade with top rail Galvanized 9-gauge wire 72 tall (2 mesh) KK chain link fabric CR30 top rail 1 5/8 diameter CR30 line post 1 5/8 diameter minimum CR30 terminal post 2.5 diameter minimum All ends must break at terminals and gates with tension and brace bands. No wrapping corners All top rail must break on rail ends All ties to be 9 gauge tie wire Tension bars to be one piece Double drive gate to be latching and lockable Gate leaves to be square corners and 1 5/8 frame minimum Footings must be minimum 8 diameter and 30 deep Surfacing: Engineered Wood Fiber to be ASTM2075 and 1292 and IPEMA compliant with certificate from mill upon request Geotextile: minimum 3.5 oz non-woven fabric Minimum Lap all edges 3 staple every 6 on center minimum exception for cutting around post Borders and ramps must have minimum 10-year warranty on products Warranty: Manufacturer warrants product against defects in materials and workmanship as well as maintain structural integrity. (see attachment for SRP warranty for playground structure equipment warranty info) Installation: Installer must be certified by manufacturer Installer must be certified to work in state of South Dakota Must provide Certification company has (CPSI) Certified Playground Safety Inspector All footings must be by manufacturers standards or greater Installer must be in-house Installer must provide statement of 1 year workmanship warranty Concrete to be 3,000 psi strength and mixed outside hole for all applications (no dry mix applications) Installer responsible for unloading and storing all materials until install Installer to be responsible for all damages until completion of project Installers must provide a safe environment during construction. |
||||||||||
Details | Park/Playground, Renovation.
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |