Similar Projects
Blackburn Street Multi-Residential Renovation
Addition, Demolition, Infrastructure
Design
$600,000 CJ est. value
Gurnee, IL 60031

Blackburn Street Multi-Residential Renovation
Addition, Demolition, Infrastructure
Design
$600,000 CJ est. value
Gurnee, IL 60031

Deerpath Park Synthetic Turf Fields
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Lake Forest, IL 60045

Curb and Gutter Installations
Infrastructure
Post-Bid
Lake Villa, IL

Seymour Alley Reconstruction
Infrastructure
Post-Bid
Mundelein, IL

Asphalt Pavement and Concrete Sidewalk Repairs
Results
Libertyville, IL 60048

Asphalt Pavement and Concrete Sidewalk Repairs
Results
Libertyville, IL 60048

Peterson Road Mixed Use
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Libertyville, IL 60048

Community Park Paving Improvements
Alteration
Post-Bid
Mundelein, IL 60060

Pulverization of The Existing Pavement and the Construction of Hot-Mix Asphalt Binder and Surface Courses
Results
Less than $137,064 est. value
Libertyville, IL

Soil Preparation at Grant Woods Forest Preserve
Infrastructure
Post-Bid
Ingleside, IL 60041

2021 Road Program
Infrastructure
Results
$1,350,000 est. value
Zion, IL

Shoreline Stabilization/Landscape Restoration
Infrastructure
Post-Bid
Mundelein, IL 60060

Joint Pavement Patching and Libertyville Public Alleys Resurfacing
Infrastructure
Results
Libertyville, IL

27th Street Resurfacing Phase III Engineering Services
Infrastructure
Post-Bid
Zion, IL

Last Updated 01/11/2023 05:35 AM
Project Title

Streets - Pedestrian Bridge over US 41 - City of Highland Park

Physical Address View project details and contacts
City, State (County) Highland Park, IL 60035   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2024
Bids Due View project details and contacts
Estimated Value $450,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not been determined. This project is in included in the City of Highland Park FY 2023-2032 CIP. As of January 11, 2023, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents