Similar Projects
Lift Station 3 Rehabilitation
Renovation
Bidding
$300,000 est. value
Edgewater, FL

Lift Station - 5 Rehabilitation
New Construction
Bidding
Holly Hill, FL

Reuse Reservoir Expansion and Pump Station Replacement
Renovation
Post-Bid
$1,670,000 est. value
New Smyrna Beach, FL 32168

Lift Station #9 Replacement
Results
Less than $320,908 est. value
Holly Hill, FL 32117

Lift Station #10 Rehabilitation
Results
Less than $299,750 est. value
Holly Hill, FL 32117

Hope Place Lift Station Replacement
Results
Less than $128,000 est. value
Holly Hill, FL

Wilmette Avenue Stormwater Pump Station
Results
Less than $305,904 est. value
Ormond Beach, FL 32173

Kmart Pump Station Improvements
Results
Less than $585,000 est. value
De Land, FL 32720

Westside Water Reclamation In-Plant Pump Station and Headworks - Design-Build
Results
$18,000,000 to $20,000,000 est. value
Daytona Beach, FL

Ponce Inlet Lift Station Building Remodel
Results
Less than $150,000 est. value
Ponce Inlet, Port Orange, FL 32127

LPGA Lift Station 97 Rehabilitation
Results
$714,510 to $924,660 est. value
Daytona Beach, FL

Phase 4B Lake Monroe Intake, Pump Station and Raw Water Transmission Main Project
New Construction
Results
$10,000,000 est. value
Deltona, FL

NW Reclaimed Water Storage Tank and Pump Station
Results
DeLand, FL

Lift Station Maintenance and Repair
Results
Daytona Beach, DeBary, DeLand, Oak Hill, Orange City, Ormond Beach, Ponce Inlet, Port Orange, FL 32124

Herbert and Nova Master Lift Station Rehabilitation
Results
$890,000 est. value
Port Orange, FL

Last Updated 06/25/2021 08:56 AM
Project Title

Lift Station 5 Reconstruction

Physical Address View project details and contacts
City, State (County) New Smyrna Beach, FL   (Volusia County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of new lift station no. 5, including new 6-foot diameter wet well, valve vault, new submersible wastewater pumps, discharge piping and appurtenances, control panel, and various site improvements including fencing and landscaping, and other work displayed or described in the contract documents. demolition and abandonment of existing lift station no. 5 and existing lift station no. 35. installation of approximately 2,400 lf of 10-inch pvc gravity sewer main and approximately 400 lf of 6-inch pvc force main. connection to existing wastewater system.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents