Similar Projects
MUNI - Dev Plan - Overlook at Kennerly Lake Lot 33A - Taylor Morrison Of Georgia Llc.
New Construction, Infrastructure
Design
$104,166 CJ est. value
Rocky Face, GA 30740

MUNI - Dev Plan - Overlook at Kennerly Lake Lot 33A - Taylor Morrison Of Georgia Llc.
New Construction, Infrastructure
Design
$104,166 CJ est. value
Rocky Face, GA 30740

RSC West Hill Cemetery Drainage Dalton Project
Infrastructure
Bidding
$200,000 CJ est. value
Dalton, GA 30720

RSC West Hill Cemetery Drainage Dalton Project
Infrastructure
Bidding
$200,000 CJ est. value
Dalton, GA 30720

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Varnell Elementary School Paving
Results
Dalton, GA 30721

2021 Milling and Resurfacing of Various City Streets
Infrastructure
Results
Dalton, GA

Essentia Protein Solutions Broth Factory
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Dalton, GA 30720

RFP D/B - ADA Playground Equipment for 6 Elementary Locations
Infrastructure
Bidding
$50,000 CJ est. value
Dalton, GA 30721

Miscellaneous HDPE Conduit - Materials Only
Infrastructure
Post-Bid
Dalton, GA

5.8 T Riverbend Road at SR 3 Improvements and Signal Modification
Infrastructure
Results
Dalton, GA 30721

RFP D/B - Pleasant Grove Elementary Playground Equipment
Infrastructure
Bidding
$45,000 CJ est. value
Dalton, GA 30721

Dalton City 11 Substation Site Preparation
Infrastructure
Post-Bid
Dalton, GA

Agriculture Meter Installation
Infrastructure
Results

Last Updated 11/16/2022 02:34 PM
Project Title

Mill Creek Riverwalk - Phase II

Physical Address View project details and contacts
City, State (County) Dalton, GA 30720   (Whitfield County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The principal items of construction are: Construction of a 6,369 lineal feet, 8 foot wide asphalt multi-use trail along the City of Dalton property and permanent easement in Dalton, Georgia ("Project") with a bid alternate of a 1,647 lineal feet, 8 foot wide asphalt multi-use trail along the City of Dalton property and permanent easement in Dalton, Georgia ("Alternate"). The project will require the contractor to construct an asphalt trail, an asphalt parking lot, gravity walls, gabion walls, a timber boardwalk, drainage structures and fencing with an access gate. The bid alternate will require an asphalt trail and a pre-engineered bridge. The project begins at the Eagle Scout Trail Head located at 1027 Chattanooga Avenue, Dalton, Georgia 30720 and will end at a tie in to a gravel utility drive in Haig Mill Lake Park located at 161 Shiloh Way, Dalton, Georgia 30720. Bidders shall inform themselves of and comply with all conditions and specifications contained in the bid package, contract, related documents and State and Federal Law. One Contract shall be awarded covering all work and the maximum time for completion shall not exceed 270 consecutive calendar days from the starting date specified in the Notice to Proceed. Bidders must agree to pay as liquidated damages the sum of $300.00 per each consecutive calendar day thereafter. Due consideration will be given to delivery of materials in specifying starting date. Bids must be accompanied by a Certified Check or Bid Bond in an amount equal to not less than five percent (5%) of the bid to be considered. No bid may be withdrawn after the scheduled closing time for receiving bids for a period of sixty (60) days. The Owner reserves the right to reject any or all bids (and/or alternates) and to waive formalities and re-advertise. All questions must be emailed to Allen Peterfreund, PE, allen.peterfreund@acpga.com Tuesday, November 8, 2022 at 12:00 pm

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents