Last Updated 02/13/2019 04:44 AM
Project Title

Fdp, Mill, Thin Lift Overlay

Physical Address View project details and contacts
City, State (County) (Colleton, Dorchester Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Maintenance Stone 61.100 Ton Liquid Asphalt Binder Pg64-22 1,128.319 Ton Full Depth Asph. Pav. Patching 6" Unif. 6,110.000 Sy Milling Existing Asphalt Pavement (Variable) 10,634.000 Sy Milled-In Rumble Strip 23.670 Mi Hot Mix Asphalt Surface Course Type d 17,162.250 Ton Driveway Paving-Surface Type d 747.500 Ton Permanent Construction Signs (Ground Mounted) 2,424.000 Sf 4" White Broken Lines(Gaps Excl.)Perm.Pvmt.Marking 3,646.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Perm.Pvmt.Marking 150,949.000 Lf 8" White Solid Lines Perm.Pvmt.Markings 516.000 Lf 12" White Solid Lines - Perm.Pvmt.Markings 250.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Perm.Pvmt.Marking 2,778.000 Lf White Single Arrows (Lt, Strght, Rt) Perm.Pvmt.Marking 30.000 Ea White Word Message "Only" -Perm.Pvmt.Marking 30.000 Ea 4" Yellow Broken Lines(Gaps Exc)Perm.Pvmt.Marking 9,730.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Perm.Pvmt.Marking 80,248.000 Lf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 7,052.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 313,898.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 1,032.000 Lf 12" White Solid Lines - Fast Dry Paint 500.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 5,556.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 60.000 Ea White Word Message "Only"-Fast Dry Paint 60.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 20,400.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 165,596.000 Lf 6" Yellow Solid Line On Curb/Median - Fast Dry Paint 660.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 317.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 954.000 Ea Removal Of Pavement Markings 72,128.000 Lf 4" White Solid Lines-(Pavement Edge Lines)-Single Component Hybridized Polymer-20 Mils 6,000.000 Lf 4" Yellow Broken Lines (Gaps Excluded) - Single Component Hybridized Polymer - 20 Mils 470.000 Lf 4" Yellow Solid Lines (Pavement Edge & No Passing Zone) - Single Component Hybridized Polymer - 20 Mils 2,550.000 Lf Furnish & Install 1.0" Schedule 80 Pvc Conduit 170.000 Lf Furnish & Instl No. 14 Copper Wire,1-Conductor For Loop Wire 3,150.000 Lf Sawcut For Loop Detector 1,387.000 Lf Install Flush Mounted Wireless Sensor 22.000 Ea Remove Flush Mounted Wireless Sensor 22.000 Ea
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents