Similar Projects
Titan Offices / Manufacturing Facility
New Construction
Conception
Aberdeen, SD 57401

Sawtooth Campground & Cabins
New Construction, Infrastructure
Conception
Hill City, SD

Block 5 Project
New Construction, Infrastructure - 5,000 SF
Design
$60,000,000 CJ est. value
Rapid City, SD 57701

Design Build to Construct Six Offices and Replace Carpet
New Construction - 720 SF
Design
$100,000 to $250,000 est. value
Aberdeen, SD 57401

E. Anamosa Street - Street and Storm Sewer Repairs
Infrastructure
Bidding
$716,181 CJ est. value
Rapid City, SD 57703

Modify Intersection, PCC Surfacing
Infrastructure
Bidding
$3,600,000 CJ est. value
Harrold, SD 57536

ATY Terminal Site Improvements Watertown Regional Airport
Infrastructure
Post-Bid
Watertown, SD 57201

Phase 2 Grading Project - Central Park
Infrastructure
Post-Bid
$350,000 est. value
Harrisburg, SD

Architectural and Engineering Services, DOT Office Addition
New Construction - 10,000 SF
Results
$2,250,000 est. value
Sioux Falls, SD 57107

D & I Railroad Mainline and Crossing Improvements
New Construction, Alteration
Results
Brookings, SD

Liberty Plaza Mixed Use
New Construction - 450,000 SF
Construction
$110,000,000 est. value
Box Elder, SD 57719

Sioux Steel Mixed Use Redevelopment
New Construction - 583,400 SF
Construction
$185,000,000 est. value
Sioux Falls, SD 57104

WholeStone Farms Pork Harvesting And Processing Facility
New Construction, Infrastructure
Pending Verification
$500,000,000 CJ est. value
Sioux Falls, SD 57104

Mitchell Area Safehouse Relocation
New Construction - 17,000 SF
Pending Verification
$4,000,000 est. value
Mitchell, SD

RR Grade Separation, CE
Infrastructure
Conception
$10,000,000 CJ est. value
Sioux Falls, SD 57107

Last Updated 11/10/2022 09:11 AM
Project Title

Mueller Land Development/Tea

Physical Address View project details and contacts
City, State (County) Beresford, SD 57004   (Union County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Office, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of industrial space and offices. An exact scope of work has not yet been released. As of November 10, 2022, this project was seeking approvals with Tea Planning Board on November 7, 2022. An architect and general contractor have not been disclosed. A firm construction timeline has not been announced. * *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents