Similar Projects
Tuscan Neighborhood Park - WCE901 - City of Elk Grove
Infrastructure
Conception
$5,383,000 CJ est. value
Elk Grove, CA 95624

Folsom Plan Area Fire Station #34 - City of Folsom
New Construction, Infrastructure
Conception
$10,800,000 CJ est. value
Folsom, CA 95630

Phan Apartment Homes At Sierra Vista Park
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Sacramento, CA 95823

Valley Rail Project / Altamont Corridor Express- San Joaquin Joint Power Authority
Infrastructure
Design
$404,000,000 CJ est. value
Sacramento, CA 95814

Broadway Complete Street Project
Infrastructure
Bidding
$15,600,000 CJ est. value
Sacramento, CA 95814

Fern Bacon Middle School Safe Routes to School (SRTS) - 574 - County of Sacramento
Infrastructure
Bidding
$2,000,000 CJ est. value
Sacramento, CA 95823

RFQ Engineering - Design Services for Merced to Madera
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Sacramento, CA 95814

Folsom Dam Raise: LRWD and Main Dam Construction
New Construction
Post-Bid
$100,000,000 to $250,000,000 est. value
Folsom, CA

On-Call Drilling and Well Installation Services for City Landfills
Term Contract, Alteration
Results
Sacramento, CA

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

3S Apartments
Demolition, New Construction, Infrastructure - 2,300 SF
Construction
$71,500,000 CJ est. value
Sacramento, CA 95811

Shops at Folsom Ranch
New Construction, Infrastructure - 27,900 SF
Construction
$9,000,000 CJ est. value
Folsom, CA 95630

Sunrise Mall Redevelopment
New Construction, Infrastructure - 695,000 SF
Pending Verification
$400,000,000 CJ est. value
Citrus Heights, CA 95610

Ice Box
New Construction, Infrastructure - 79,190 SF
Pending Verification
$25,000,000 CJ est. value
Sacramento, CA 95811

Category III Instrument Landing System and Runway Lighting - P000437 - Sacramento County
Infrastructure
Conception
Less than $8,300,000 est. value
Mather, CA 95655

Last Updated 04/14/2023 01:03 PM
Project Title

Folsom Main, Left Wing and Right Wing Dams

Physical Address View project details and contacts
City, State (County) Sacramento, CA 95814   (Sacramento County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $114,445,377 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 14, 2023, project is still in preconstruction phase. This might go out for Sub bidding in the next 2 - 3 weeks; and construction could start 3 months from now. Award Details Contract Award Date: Mar 31, 2023 Contract Award Number: W9123823C0010 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: Contractor Awarded Name: FOLSOM DAM CONSTRUCTORS -----> (Joint Venture of California Engineering Contractors and Schimmick Construction) Contractor Awarded Address: Pleasanton, CA 94566-9792 USA Base and All Options Value (Total Contract Value): $114,445,377.00 The Folsom Dam Raise Project is a Flood Risk Management project which will provide system-wide flood damage reduction benefits when combined with the common features efforts within the Sacramento Valley. The key project features Main Dam Spillway work on all eight Tainter gates which includes structural retrofits to the trunnion anchorage system, structural reinforcing to strengthen gates, 'top seal' structural headwalls installed above each gate, concrete pier extensions, new elevated hoist platforms, and new cable hoist system with new electrical controls. Also, key is the Left and Right Wing Dams work which includes construction of a reinforced L-shaped concrete floodwall (3.5-feet height) above existing ground level, embankment work, relocation of utility and security features, and a removable stoplog system approximately 20 feet wide will be framed and installed through the concrete flood wall near the tie-in location between the Main Dam and the Left Dam. The disclosure of magnitude for construction is between $100,000,000.00 to $250,000,000.00. This will be an unrestricted procurement, using a Lowest Price Technically Acceptable method. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The deadline date and time for Contractual and Technical inquiries and questions is 4:00 p.m. PST on 10 NOV 2022

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents