Similar Projects
Last Updated | 04/14/2020 06:17 AM |
Project Title | Horsetooth Dam West Guard Gate Valve Project |
Physical Address | View project details and contacts |
City, State (County) | Bellvue, CO 80512 (Larimer County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | remove the existing coating from the exterior of the gate bonnet, cylinder assembly and flange by abrasive blasting. The bonnet to be repainted is coated with coal tar epoxy and a lead-based primer. The Contractor shall remove the existing coatings by use of a blast agent that is approved for use with lead paint and which has an approved “lead abatement additive”. All residues and waste products resulting from the removal of existing coatings shall be contained and removed from the dome chamber and tunnel area and shall be disposed of in accordance with local, state and federal environmental regulations, guidelines and laws. The final surface condition required is SP10, near white. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |