Project Title | Inspection and Construction Management Services for Cycle 2 Street Resurfacing Project |
Physical Address | View project details and contacts |
City, State (County) | Manhattan Beach, CA 90266 (Los Angeles County) |
Category(s) | Single Trades |
Sub-Category(s) | Environmental |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Start/Delivery Date Late March 2023 Project Duration March - July 2023 The Manhattan Beach Cycle 2 Street Resurfacing Project is a Public Works construction project including, but not limited to, reconstructing seven street segments totaling approximately 6,820 linear feet. The street segments are as follows: 1. 27th Street from Laurel Avenue to Pacific Avenue; 2. Agnes Road from 29th St. to Marine Avenue; 3. Flournoy Road from Ardmore Avenue to 19th Street; 4. 29th Street from Blanche Road to Agnes Road; 5. Flournoy Drive from Valley Drive to 33rd Street; 6. Marine Avenue from Blanche Road to Valley Drive; and 7. 14th Street from Pacific Avenue to Laurel Avenue. Five of the above-referenced segments (Nos. 1, 2, 4, 5 and 6) include construction of rolled curb and gutter and pavement removal and construction. Two segments (Nos. 3 and 7) include milling of the existing pavement surface and placement of a new asphalt rubber surface course over pavement fabric. Other work includes construction of 15 access ramps and a section of new sidewalk (on the west side of Flournoy Road from Valley Drive to 25th Street), including all incidental work described in the contract documents. The Project also includes Additive Bid Items for construction of two traffic calming bulb-outs at Marine Avenue and 25th Street and Ardmore Avenue and Flournoy Road. The City intends to provide full-time oversight of the Contractor by procuring the services of a Consultant that can provide the personnel to perform project inspection services, special inspection services, and construction management. The Consultants services are required from start to completion of the Cycle 2 Street Resurfacing Project (Project) to ensure the Contractor performs all the necessary work as described in the contract documents for Project No. P-919, Bid No. 51271-22C, as well as other tasks identified herein. All work will be performed to the highest professional standards and will reflect the thoroughness, attention to detail and professional knowledge expected in overview of all the associated construction phases. It is the Citys preference that the project inspection and construction management tasks be performed by the same person, since the construction management tasks are intended to be performed on a part-time basis. It is anticipated that the Consultant project inspector and construction manager will be required during preconstruction, construction, and closeout for the Project. The City expects the Consultant project inspector to be on-site for the entire duration of the construction and closeout of the Project. Construction of the Project is anticipated to last approximately 75 total Working Days. The Consultant shall be responsible for construction management and inspection, which includes but is not limited to the overall contract compliance, contract change order review, schedule changes, construction inspections, and quantity calculations and verification. The City will have a project manager (City Project Manager) assigned to the project to be available for the project duration. The typical workday includes all hours worked by the construction Contractor. The construction Contractor's operations may be restricted to specific hours during the week, which shall become the normal workday for Consultant personnel. The City Project Manager shall have the authority to increase, decrease, or eliminate Consultant personnel work hours dependent on the schedule and requirements of the construction Contractor. Question Deadline 12/29/2022 at 12:00 PM PT Online Q&A Yes |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |