Similar Projects
Washington County Crisis Stabilization Services
Renovation
Results
AR

Enhanced Healthcare Of The Ozarks
New Construction - 4,893 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Rogers, AR 72758

Creekside Medical Offices
New Construction - 7,600 SF
Design
Rogers, AR 72758

Children's Safety Center
New Construction - 15,200 SF
Design
$8,000,000 est. value
Springdale, AR 72762

Parachute Plasma
New Construction - 7,624 SF
Construction
$1,800,000 est. value
Searcy, AR 72143

Lei Clinic
New Construction - 8,000 SF
Conception
Little Rock, AR 72223

Parachute Plasma
New Construction - 8,048 SF
Construction
$2,000,000 est. value
El Dorado, AR 71730

Reported 01/12/2022 12:00 AM
Project Title

EHRM - Infrastructure Upgrades

Physical Address View project details and contacts
City, State (County) Little Rock, AR 72205   (Pulaski County)
Category(s) Medical
Sub-Category(s) Medical Office/Outpatient
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide construction services to include all labor, materials, tools, equipment, transportation, supervision, and other services necessary to upgrade the leased property. The Contractor shall provide design services and a complete design package containing drawings and specifications. The design drawings and specifications shall follow all applicable codes, manuals, standards, and guides, including those listed in Paragraph 4. 1.1.2 The Contractor shall provide construction services for the following infrastructure improvements, as necessary to meet listed requirements: 1.1.2.1 Communication infrastructure including new data outlets, patch panels, upgrades to Cat 6A cable, fiber infrastructure backbone within building. Electrical infrastructure including electrical panel upgrades, normal and emergency power, as applicable, bonding, Uninterruptible Power Supply (UPS) system and Building Management (BMS) interfaces to manage and monitor UPS. 1.1.2.3 HVAC infrastructure including temperature and humidity upgrades, rack and space sensors, and BMS interfaces to manage and monitor temperature and humidity. 1.1.2.4 Reconfiguration of existing space including demolition, new construction, and finishes. 1.1.2.5 Physical security upgrades including telecommunication room cameras, alarms, and necessary interfaces to existing security system. 1.1.2.6 Identification and appropriate remediation of hazardous materials, as needed for project.

Details

Medical Office/Outpatient, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents