Similar Projects
Bridge Deck Preservation near Vernal
Infrastructure
Post-Bid
$500,000 CJ est. value
Vernal, UT 84078

Jones Hole National Fish Hatchery - Water System Improvements
Infrastructure
Post-Bid
$150,000 CJ est. value
Vernal, UT 84078

Uintah School District UHS Agricultural Building
New Construction, Infrastructure
Results
$3,581,880 CJ est. value
Vernal, UT 84078

Multi-step Bidding Process for General Contractors Red Fleet State Park - New Campground
New Construction, Infrastructure
Results
$7,025,814 CJ est. value
Vernal, UT 84078

Uinta Basin Railway
New Construction, Infrastructure
Pending Verification
$1,500,000,000 CJ est. value
Vernal, UT 84078

UDOT Vernal MS4 Project
Infrastructure
Post-Bid
$400,000 est. value
Vernal, UT

Vernal Regional Airport Construct Taxilane C
Infrastructure
Results
$597,902 CJ est. value
Vernal, UT 84078

Cedarview Reservoir Pipeline Installation
Infrastructure
Post-Bid
$200,000 est. value
Fort Duchesne, UT

Vernal Regional Airport
Infrastructure
Results
$2,276,866 CJ est. value
Vernal, UT 84078

Installation of Water and Wastewater Services for Ute Tribe Water Systems
Infrastructure
Post-Bid
$160,000 CJ est. value
Fort Duchesne, UT 84026

500 North; Vernal Avenue to 500 East Small Urban
Infrastructure
Results
$1,500,000 CJ est. value
Roosevelt, UT 84026

Western Park Ice Rink and Amphitheater Project
New Construction, Infrastructure
Post-Bid
$130,000 CJ est. value
Vernal, UT 84078

Construction of the 500 West Safe Sidewalk Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Vernal, UT 84078

Shepherd's Weir
Demolition, New Construction, Infrastructure
Post-Bid
$600,000 CJ est. value
Fort Duchesne, UT 84026

RFQ Construction Manager - Construction Manager/General Contractor Service for the Tridell Fire Station / Community Center
New Construction, Infrastructure
Post-Bid
$845,000 CJ est. value
Tridell, UT 84039

Last Updated 07/12/2023 04:36 AM
Project Title

GAOA Leidy Peak Road Culvert Replacement, Ashley National Forest, UT

Physical Address View project details and contacts
City, State (County) Vernal, UT 84078   (Uintah County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Gaoa Leidy Peak Road Culvert Replacement, Ashley National Forest, Utah This Project is for Supply and Delivery of Corrigated Steel Pipe and Bands in Accordance With Section B Schedule of Items and Section J. This is a 100% Set Aside for Small Business Entities.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents