Similar Projects
Project Aspen Roadway Improvements
Infrastructure
Bidding
Rock Hill, SC 29732

Reconstruction/Rehabilitation - District 4
Post-Bid

Pavement Replacement Project
Infrastructure
Post-Bid
Fort Mill, SC 29715

Tega Cay 2020 C-Fund Project
Results
$100,000 to $160,000 est. value
Tega Cay, SC

2020 Road Rehabilitation Project
Results
Less than $150,000 est. value
Clover, SC 29710

Genthe Court Extension
New Construction
Post-Bid
SC

Interstate 77 Panther Interchange Project
Results
SC

Reconstruction/Rehabilitation - District 4
Results

Pavement Rejuvenator
Results
Rock Hill, SC 29730

Rehabilitation/Reconstruction - York County
Results
SC

Dist 4 On-Call Lane Closure
Term Contract
Results

Preservation - District 4
Results

Galleria Blvd. Extension Project
Results
SC

Catawba River Trail - Quality Circle Connector
Results
Rock Hill, SC

US 321/Kings Mountain Road Intersection
Results
$2,000,000 est. value
York, SC 29745

Last Updated 11/10/2021 01:03 AM
Project Title

Reconstruction/Rehabilitation - York Co

Physical Address View project details and contacts
City, State (County) SC   (York County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Railroad Insurance And Flagging 001 1.000 Ls Removal & Disposal Of Existing Pavement 200.000 Sy Removal & Disposal Of Existing Curb 1,695.000 Lf Removal & Disposal Of Existing Concrete 84.000 Cy Unclassified Excavation 2,950.000 Cy Borrow Excavation 465.000 Cy Station Grading 13.730 Sta Excavation For Shoulder Paving 168.460 Sta Hauling Of Excavated Shoulder Material 168.460 Sta Maintenance Stone 139.000 Ton Hot Mix Asphalt Base Course - Type b 6,942.000 Ton Hma Shoulder Widening Course 1,289.184 Ton Liquid Asphalt Binder Pg64-22 2,302.235 Ton Full Depth Asph. Pav. Patching 8" Unif 905.000 Sy Full Depth Asph. Pav. Patching 12"Unif 6,940.000 Sy Milling Existing Asphalt Pavement 1.75" 47,410.000 Sy Milling Existing Asphalt Pavement 2.0" 103,580.000 Sy Milling Existing Asphalt Pavement 3.0" 11,400.000 Sy Milling Existing Asphalt Pavement 4.0" 35,046.000 Sy Milling Existing Asphalt Pavement (Variable) 128,336.000 Sy Milled-In Rumble Strip 7.340 Mi Hot Mix Asphalt Intermediate Course Type b 6,900.341 Ton Hot Mix Asphalt Surface Course Type b 20,249.622 Ton Hot Mix Asphalt Surface Course Type c 927.500 Ton Hot Mix Asphalt Surface Course Type e 5,211.360 Ton Driveway Paving-Surface Type c 664.500 Ton Permanent Construction Signs (Ground Mounted) 1,860.000 Sf Construction Zone Electric Changeable Message Sign (Trailer 2.000 Ea Pavement Markings (Temporary Paint) 24"x36" White Triangle Yield Bar 124.000 Lf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 41,725.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 132,547.000 Lf 6" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 4,226.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 1,724.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 4,798.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 147.000 Ea White Word Message "Only"-Fast Dry Paint 98.000 Ea White Combination Arrow(Str.& Rt.Or Str.& Lt.)Fast Dry Paint 8.000 Ea White Lane Drop Arrow (Left Or Right)-Fast Dry Paint 14.000 Ea Railroad Crossing Symbols - Fast Dry Paint 4.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 15,366.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 302,106.000 Lf 6" Yellow Solid Line On Curb/Median - Fast Dry Paint 4,242.000 Lf 24" Yellow Diagonal Lines - Fast Dry Paint 600.000 Lf 4" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 20,539.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 48,555.000 Lf 6" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 1,753.000 Lf 8" White Solid Lines Thermoplastic - 125 Mil. 812.000 Lf 24in x 36in White Triang. Yield Bar (Gaps Exc)Thermo-125mil 60.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Thermo.-125 Mil 2,260.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 65.000 Ea White Word Message "Only" -Thermoplastic - 125 Mil. 42.000 Ea White Combination Arrows(Str&Rt.Or Str&Lt)Thermo-125mil 4.000 Ea White Lane Drop Arrow(Lt.Or Rt.)Thermo-125mil 7.000 Ea Railroad Crossing Symbols - Thermoplastic - 125 Mil. 2.000 Ea 4" Yellow Broken Lines(Gaps Exc)Thermoplastic - 90 Mil. 7,931.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 134,040.000 Lf 24" Yellow Solid Lines - Thermoplastic - 125 Mil. 200.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 982.000 Ea Permanent Yellow Pavement Markers Mono-Dir.- 4"x 4" Perm. Yel. 755.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 2,044.000 Ea Furnish & Install 1.0" Schedule 80 Pvc Conduit 805.000 Lf Furnish & Instl No. 14 Copper Wire,1-Conductor For Loop Wire 11,658.000 Lf Sawcut For Loop Detector 4,960.000 Lf Temporary Adjustment Of Traffic Signal Equipment 5.000 Ea Catch Basin -Type 1 Cb - Type 1 3.000 Ea Catch Basin -Type 16 1.000 Ea Adjust Drop Inlet Adjust d. i. 1.000 Ea Catch Basin t-17 (Convert c.b. Type 6) 4.000 Ea Catch Basin t-18 (Convert c.b. Type 7) 4.000 Ea Concrete Curb (9" x 15") 1,697.000 Lf Concrete Curb And Gutter(2'-0") Vertical Face 75.000 Lf Concrete Sidewalk(4" Uniform) 285.000 Sy Detectable Warning Material 100.000 Sf Concrete Median 510.000 Sy Concrete Flume 3.000 Ea Pedestrian Ramp Construction 200.000 Sy Remove & Dispose Semi-Rigid Gr Device 365.000 Lf Mt3 Leading End Treatment Tl3 4.000 Ea Mgs3 Gr Standard Shoulder 125.000 Lf Sacrificial Flexible Warning Marker Post (Fwmp) 48y/y 10.000 Ea Permanent Grassing For Non-Permitted Resurfacing Projects 3.570 Acre Silt Fence 300.000 Lf Replace/Repair Silt Fence 50.000 Lf Removal Of Silt Retained By Silt Fence 50.000 Lf

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents