Similar Projects
Last Updated | 09/15/2022 06:05 PM |
Project Title | Large Trash Capture Device Installation Phase VII |
Physical Address | View project details and contacts |
City, State (County) | San Jose, CA 95112 (Santa Clara County) |
Category(s) | Single Trades |
Sub-Category(s) | Equipment |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $8,970,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project generally involves installing the precast Hydrodynamic Separator Devices (HDS) with the large hatch and stop logs at the six (6) citywide locations, removing and replacing storm facilities including laterals, inlets, and manholes, installing 8-inch diameter Sanitary Sewer mains and manholes, relocating 12-inch diameter waterlines, removing and replacing the curb and gutter, installing 6-inch PCC pad, the pavement restoration, and the traffic striping. BID SECURITY Each bid must be accompanied by cash, a certified check, a cashier's check or a bidder's bond in the sum of not less than 10% of the total aggregate amount of the bid. Checks shall be made payable to the order of the City of San Jose. Bonds shall be executed by a surety possessing a valid certificate of authority issued by the California Department of Insurance and shall name the City of San Jose as beneficiary. All bids must be addressed to the Director of Public Works, City of San Jose, shall bear the Project Number and Name and be in a sealed envelope. PREVAILING WAGES (Municipal Affair) This project is a "public works" as defined in Sections 1720 through 1720.6 of the California Labor Code. In accordance with Chapter 14.09 of the San Jose Municipal Code entitled "Prevailing Wage Requirements for City Contracts Involving Public Works," the contractor will be required to comply with the prevailing wage provisions in California Labor Code Sections 1720 through 1861, and the City's Office of Equality Assurance is authorized to provide certain local enforcement of those provisions. As such, the contractor will need to pay not less than the general prevailing rate of per diem wages and the general prevailing rates for holiday and overtime work. Bidders must have a California contractor's license, classification A to bid this project. BOND REQUIREMENTS Bidder's attention is directed to those provisions of the Specifications which require the contractor to whom the contract for the work is awarded, to file with the City Clerk at the time the contract is executed, a Contractor's Payment Bond and a Bond for Faithful Performance meeting all the requirements of the Specifications and approved by the City Attorney of the City of San Jose. Bonds shall be executed by a surety possessing a valid certificate of authority issued by the California Department of Insurance and shall name the City of San Jose as beneficiary. The Contractor's Faithful Performance Bond shall be for 100% of the contract amount. The Contractor's Payment Bond shall be for 100% of the contract amount. Question Deadline 09/08/2022 03:00:00 PM PT |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |