Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

I-80 at Echo and Wanship Bridge Preservation
Infrastructure
Bidding
$3,000,000 CJ est. value
Coalville, UT 84017

I-80; Emory to Castle Rock
Infrastructure
Bidding
$6,000,000 CJ est. value
Coalville, UT 84017

Mountain Life Church Expansion
New Construction, Addition - 45,956 SF
Post-Bid
Park City, UT 84098

Clark Ranch Project
Infrastructure
Post-Bid
Park City, UT

Weilenmann School of Discovery - Building Expansion
Renovation
Results
Less than $1,900,000 est. value
Park City, UT 84098

Bookcliffs Pond Maintenance and Excavating
Infrastructure
Results

Bingham High Remodel - Phase III - Part II
Renovation
Construction
South Jordan, UT

Park City Mountain Resort Area Base Master Plan
New Construction, Infrastructure - 27,100 SF
Pending Verification
$76,300,000 CJ est. value
Park City, UT 84060

Sommet Blanc
New Construction, Infrastructure - 3,600 SF
Pending Verification
$18,000,000 CJ est. value
Park City, UT 84060

Heritage Park Utility Pipelines
Infrastructure
Post-Bid

Franklin Spring Rehabilitation Project
Infrastructure
Results
$157,000 est. value
Henefer, UT

Hallam Road Extension - Summit County
Infrastructure
Pending Verification
$7,300,000 CJ est. value
Kamas, UT 84036

Park City High School Expansion Bid Package BP-01
Renovation
Post-Bid
$7,000,000 est. value
Park City, UT 84060

Marsac Avenue Water Line Replacement
Infrastructure
Results
Park City, UT 84060

Last Updated 08/18/2022 04:06 PM
Project Title

Ecker Hill Middle School Remodel and Addition Bid Package: BP-01

Physical Address View project details and contacts
City, State (County) Park City, UT 84098   (Summit County)
Category(s) Education, Heavy and Highway, Sewer and Water
Sub-Category(s) Middle/Senior High School, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Construction is expected to begin in September 2022. Ecker Hill Middle School Remodel & Addition BP-01 - Demolition, Site, Earthwork and Utilities All project correspondence including RFI's, clarifications requests and product approval requests must be emailed to Brian Richards ( brichards@hoganconstruction.com ). The Owner reserves the right to reject any or all bids or proposals or to waive any formality or technicality deemed in its best interest. Qualifications may be requested, before or after the bid date, of any bidder.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents