Similar Projects
Last Updated | 05/31/2023 09:51 AM |
Project Title | 18th Street Viaduct - 719-071 - City of Sioux City |
Physical Address | View project details and contacts |
City, State (County) | Sioux City, IA 51105 (Woodbury County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Design Development, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $800,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project will construct a grade separation on 18th Street over the railroad tracks between Floyd Boulevard and Steuben Street. Storm sewer upgrades and trail additions from the proposed viaduct to the Floyd River levee will be included as part of the area improvements under a separate construction contract. The proposed project will include a new 500-foot long bridge spanning the Union Pacific Railroad and Canadian National Railway railroad tracks. A segment of Hawkeye Drive and Illinois Avenue will be realigned to improve intersection geometrics. As part of the final design of the 18th Street Viaduct, the Hoeven Valley Transportation Plan will be updated to reflect completed projects in the corridor. This project will allow for the elimination of multiple rail/vehicle conflict locations, and allow for expansion of neighboring businesses both in facility and with their rail switching and storage operations. As of August 24, 2021 no new CIP issued, this project is currently in the FY 2022-2026 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. Letting is anticipated for August 2018 with construction to begin November 2018. As of February 3, 2023, per the city engineer this project is not moving forward at this time. As of May 31, 2023, no new information available |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |