Similar Projects
Anne Street Bridge Rehabilitation - E16 - City of Minot
Renovation
Conception
$1,868,000 est. value
Minot, ND 58701

Bridge Replacement and Incidentals
Post-Bid
ND

Bridge Structures
Post-Bid
ND

Structure Repairs
Results

Structure Repairs
Results

West Bridge Replacements
Renovation, Infrastructure
Post-Bid
$2,500,000 est. value
Watford City, ND

Structure Replacement and Median X-Overs
Results
$2,000,001 to $2,500,000 est. value
ND

Mouse River Enhanced Flood Protection Phase SA-1 Sawyer - County Road 23 Bridge Replacement
Renovation, Infrastructure
Post-Bid
Sawyer, ND

Structure Replacement, Minor Grading and Incidentals
New Construction
Results
$600,001 to $800,000 est. value
ND

Bridge Removal
Renovation, Infrastructure
Post-Bid
$300,000 est. value
ND

Structure Replacement
New Construction
Results
Dickinson, ND

Bridge Replacement Structure
New Construction, Infrastructure
Post-Bid
$490,000 est. value
Mandan, ND

Structure Replacements
New Construction
Results
Belfield, ND 58622

Bridge Replacement
New Construction, Infrastructure
Results
$600,000 est. value
Watford City, ND

Bridge Replacement
New Construction, Infrastructure
Results
ND

Reported 07/06/2022 11:24 AM
Project Title

Phase SA-1: Sawyer Bridge - City of Minot

Physical Address View project details and contacts
City, State (County) Minot, ND   (Ward County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected December 2022
Bids Due View project details and contacts
Estimated Value $1,225,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a bridge / tunnel in Minot, North Dakota. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel. A detailed scope has not yet been determined The project is included in the city's 2022 Capital Improvement Program (CIP). As of July 5, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents