Similar Projects
Sheboygan River Swing Bridge - City of Sheboygan
New Construction, Infrastructure
Conception
$5,300,000 CJ est. value
Sheboygan, WI 53081

Sheboygan River Swing Bridge - City of Sheboygan
New Construction, Infrastructure
Conception
$5,300,000 CJ est. value
Sheboygan, WI 53081

Biggby Coffee / Sheboygan
New Construction, Infrastructure
Design
$500,000 CJ est. value
Sheboygan, WI 53083

Johnston's Bakery Frozen Dough Facility Expansion
Addition, Demolition, Infrastructure - 10,450 SF
Design
$1,000,000 CJ est. value
Sheboygan, WI 53081

Perimeter Road Asphalt Replacement
Infrastructure
Bidding
$300,000 CJ est. value
Plymouth, WI 53073

Perimeter Road Asphalt Replacement
Infrastructure
Bidding
$300,000 CJ est. value
Plymouth, WI 53073

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

North Town Site Development
New Construction, Infrastructure
Post-Bid
$470,000 est. value
Sheboygan, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Calumet Drive Pavement Repair
Results
Sheboygan, WI 53083

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Tidy Store Gas Station Addition
Addition, Infrastructure - 1,500 SF
Pending Verification
$400,000 CJ est. value
Sheboygan, WI 53081

The Kohler Company Golf Course
New Construction, Infrastructure
Pending Verification
$7,000,000 CJ est. value
Sheboygan, WI 53081

City of Plymouth Const / Misc-Sidewalk Improv NMTPP
Infrastructure
Design
$2,000,000 CJ est. value
Plymouth, WI 53073

Last Updated 01/17/2023 03:06 AM
Project Title

2023 Street Program - Clifford Street and Pony Lane

Physical Address View project details and contacts
City, State (County) Plymouth, WI 53073   (Sheboygan County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $860,327 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Sanitary Sewer (Gravity), Sitework/Excavating and Grading, Paving (Asphalt or Concrete), Aggregate, Stormwater Improvements, Waterlines, Asphalt Overlay, Rehab. and/or Maint. Prospective bidders must be on the plan holders list through for bids to be accepted. The work includes furnishing of all materials and equipment and performance of the following work, per the Plans, Specifications and Contract Documents (PS & CD) The project is located on Clifford Street between Egan Street and South Street and on Pony Lane from Riverbend Drive to the cul-de-sac. A brief description of the major work items for the above contract includes: 3,400 cubic yards of common excavation, 4,600 tons of crushed aggregate base course, 1,575 linear feet of PVC watermain, 594 linear feet of 1-inch water service, 1 lump sum temporary water main and services, 1,275 linear feet of 8-inch sanitary sewer, 6 sanitary sewer structures, 1,660 linear feet of storm sewer, 31 storm sewer structures, 2,500 linear feet of curb and gutter, 4,250 square feet of concrete sidewalk, 1,610 tons of HMA pavement. Bidders Qualification Statement is required and shall be submitted directly to the City of Plymouth per Instructions to Bidders As a part of their Bids, Bidders shall submit a full and complete list of: 1) all of the proposed Subcontractors, and 2) the class of work which each will perform. The selected Contractor shall not alter this list without the written consent of the City. The City will only consider Bids from Bidders who accompany them with a Bid Bond, payable to the City of Plymouth, in the amount not less than five percent (5%) nor more than ten percent (10%) of the Bid. This requirement serves to guarantee that, if the City accepts the Bid, the selected Contractor will execute and deliver the proper Contract Agreement and Bonds within 15 calendar days after the Notice of Award by the City. Failure to return these documents within this prescribed time will result in forfeiture, to the City of Plymouth, of the selected Contractor's Bid Bond, as liquidated damages. Complete digital project bidding documents (PS & CD) will be available at electronically You may download the digital plan documents for $20.00 (non-refundable) by inputting #8352307 on the website's Project Search page. Please contact at 952-233-1632 or for assistance in free membership registration, downloading, and working with this digital project information. Please contact Kapur & Associates if you have any questions. Optional paper copies may be obtained at the office of Kapur & Associates, Inc., 7711 N. Port Washington Rd., Milwaukee, WI 53217-3130. The paper copies are available for $40.00, non-refundable. Electronic and paper copies will be available Friday December 16th, 2022. The Owner reserves the right to reject any or all bids, waive or not waive any informality in the bids received and to accept any proposal, which they deem most favorable to the interests of the Owner.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents