Similar Projects
Heating System Repair and Replacements
Renovation
Design
$2,000,000 CJ est. value
Hartford, WI 53027

2023 Upper Nemahbin Lake Dredging Project
Infrastructure
Design
$500,000 CJ est. value
Summit, WI 53066

Goodman Township Park at Lake Hilbert Park Updates - Playground
Term Contract
Sub-Bidding
Fence, WI 54120

City of New Berlin Debris Management
Term Contract
Sub-Bidding
New Berlin, WI 53151

Asbestos, Lead-Based Paint And Hazardous Materials
Renovation
Post-Bid
Milwaukee, WI 53224

Asbestos Abatement and Disposal Services
Infrastructure, Alteration
Post-Bid
Milwaukee, WI

Capital High Fall 2022 Abatement/Demolition
Demolition, Alteration
Results
Madison, WI 53705

Port Edwards High School Science Lab Asbestos Abatement
Alteration
Results
Port Edwards, WI 54469

Dormitory Abatement and Demolition
Term Contract, Demolition, Infrastructure
Construction
$1,138,000 CJ est. value
Eau Claire, WI 54701

Convert Vehicle Storage Bays to Heated Workspace
Renovation
Construction
$112,090 CJ est. value
Delafield, WI 53018

Radionuclide System Improvements
Renovation
Sub-Bidding
$230,000 CJ est. value
Union Grove, WI 53182

East High School Asbestos Abatement and Interior Demolition
Renovation, Infrastructure, Alteration
Post-Bid
Madison, WI 53704

La Follette Asbestos Abatement and Interior Demolition
Demolition, Alteration
Results
Madison, WI

Fuel Storage Tank Demolition
Demolition, Infrastructure
Construction
$37,135 CJ est. value
Wausau, WI 54401

New Child Daycare center
Infrastructure
Sub-Bidding
$1,850,000 CJ est. value
Lac du Flambeau, WI 54538

Last Updated 05/08/2023 06:01 PM
Project Title

Battery Energy Storage System Installation and Integration with Solar PV System

Physical Address View project details and contacts
City, State (County) Washburn, WI 54891   (Bayfield County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $90,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Bayfield County Wisconsin is accepting proposals for Battery Energy Storage System Installation and Integration with Solar Photovoltaic System, Natural Gas Generator Integration, Electric Vehicle Supply Equipment Installation, and Controls. This projected funded by the Public Service Commission of Wisconsin, Office of Energy Innovation and the Department of Energy, Office of Energy Efficiency and Renewable Energy (EERE), under the State Energy Program Award Number DE-EE0000163. Installing the 60 kW / 100 kWh BESS. This system will comprise two 30 kW SolArk inverters, model 30k-3p-208, along with 4 battery storage stacks of ~24 kWh each at the Bayfield County Main Highway garage in Washburn in the electrical room, aka "Old Boiler Room" (see engineering plan). Integrating the BESS with the existing solar PV and generator to form a microgrid when disconnected from the grid using the existing Automatic Transfer Switch (ATS). The BESS and inverters are being procured and paid by the County. . Procure and install one 80A JuiceBox EVSE unit and install one Ford Pro Charger EVSE (procured by the county) on the garage existing service. . Installing all needed balance of system components including communications and non-utility metering

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents