Similar Projects
Berth 46 - Outer Harbor Cruise Terminal AMP - Port of Los Angeles
Infrastructure
Conception
$35,000,000 est. value
Los Angeles, CA

Berths 177-178 Wharf Restoration - Port of Los Angeles - Construction Division
Infrastructure
Conception
$11,400,000 est. value
Los Angeles, CA 90081

Drainage System Restoration
Alteration
Design
$822,000 est. value
Pasadena, CA 91199

Pacific Coast Highway Median Improvement
Infrastructure
Bidding
$600,000 est. value
Malibu, CA 90265

Cogen Stormwater Capture and Reuse
New Construction, Infrastructure - 189,197 SF
Bidding
$469,000 est. value
Los Angeles, CA

South Whittier Outfall Relief Trunk Sewer Rehabilitation, Phase 5
Infrastructure
Post-Bid
$8,500,000 to $12,000,000 est. value
Norwalk, CA

Maintenance of the Cerritos Sewer System
Alteration
Post-Bid
Cerritos, CA

Sewer Main Spot Repair
Alteration
Results
$650,000 est. value
Whittier, CA 90603

Sanitary Sewer Rehabilitation And Replacement Program Project 7 (SSRRP-7)
Infrastructure
Results
$641,876 est. value
Long Beach, CA 90899

VIC Derby And 42nd West MPDF Channel Improvements - 17CB007 - City of Lancaster
Infrastructure
Conception
$1,500,000 est. value
Lancaster, CA

Shoemaker Avenue Trunk Sewer Rehabilitation
Alteration
Post-Bid
$750,000 to $1,250,000 est. value
Norwalk, Santa Fe Springs, CA 90659

Construction Of District 5 Interceptor Sewer Rehabilitation Phase 1
Alteration
Results
$2,600,000 to $3,900,000 est. value
Torrance, CA

Stormwater Facilities Master Plan
Infrastructure
Post-Bid
Carson, CA

Construct Storm Water Treatment Devices and Imported Borrow
Infrastructure
Results
$4,900,000 est. value
CA

Storm Drain Catch Basin Inserts
Infrastructure
Post-Bid
Inglewood, CA 90301

Last Updated 07/20/2022 11:17 PM
Project Title

Marie Canyon Green Streets Improvements Project

Physical Address View project details and contacts
City, State (County) Malibu, CA   (Los Angeles County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the proposed improvements consist of the installation of stormwater Fabco Helix Filters within the existing catch basin facilities, cleaning and clearing the existing catch basin, and all other appurtenant work included and shown in the Contract Documents and Specifications.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents