Similar Projects
Potato Cut Project - Shasta County
Infrastructure
Conception
$1,000,000 est. value
Montgomery Creek, CA 96065

Anderson Park Concrete Repair - PW1718 - City of Carson
Infrastructure
Conception
$1,422,000 est. value
Anderson, CA 96007

Shasta County New Jail or Expansion
Addition, Demolition, New Construction, Infrastructure
Design
$125,000,000 CJ est. value
Redding, CA 96001

Shasta County New Jail or Expansion
Addition, Demolition, New Construction, Infrastructure
Design
$125,000,000 CJ est. value
Redding, CA 96001

Place RHMA, Paint Traffic Stripe and Install Fiber Optic Cable System
Infrastructure
Bidding
$27,000,000 CJ est. value
Redding, CA 96003

Place RHMA, Paint Traffic Stripe and Install Fiber Optic Cable System
Infrastructure
Bidding
$27,000,000 CJ est. value
Redding, CA 96003

USACE SPK DBB Construction - Fire Retardant Pit and Taxiway Renovations
Infrastructure
Post-Bid
$100,000,000 CJ est. value
Redding, CA 96002

USACE SPK DBB Construction - Fire Retardant Pit and Taxiway Renovations
Infrastructure
Post-Bid
$100,000,000 CJ est. value
Redding, CA 96002

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Asphalt Rubber Binder Seal Coat, Cold Plane AC Pavement and HMA
Infrastructure
Results
$1,810,000 est. value
CA

Construction of the Boulder Creek Gym Addition
Addition, Demolition, Infrastructure
Construction
$2,930,000 CJ est. value
Redding, CA 96003

Win-River Casino Strawberry Fields / Redding Rancheria Casino
New Construction, Infrastructure - 69,541 SF
Pending Verification
$127,000,000 CJ est. value
Redding, CA 96003

Win-River Casino Strawberry Fields / Redding Rancheria Casino
New Construction, Infrastructure - 69,541 SF
Pending Verification
$127,000,000 CJ est. value
Redding, CA 96003

Wynne Price Park Lighting Upgrade - City of Shasta Lake
Infrastructure
Conception
$400,000 CJ est. value
Shasta Lake, CA 96019

Moody Creek Bridge Rehabilitation - 6157 - City of Shasta Lake
Infrastructure
Design
$2,653,000 CJ est. value
Shasta Lake, CA 96019

Last Updated 09/13/2023 01:37 AM
Project Title

Construction of Old Alturas Road Over Churn Creek Bridge Widening Project

Physical Address View project details and contacts
City, State (County) Redding, CA 96003   (Shasta County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $5,096,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Engineer's Estimate is $5,096,000 The work consists of removal of portions of the existing bridge in stages, construction of new bridge widening to be completed over two seasons, retaining walls, road construction work, sidewalks, curb and gutter, traffic control and traffic handling, utility coordination, relocations and installation and storm water pollution control. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents