Similar Projects
Water Heater Replacement - Tech Building
Post-Bid
Ford Heights, IL 60411

BRL MEP Upgrades - Division 01
Renovation
Post-Bid
Chicago, IL 60612

Boiler Blowdown Header Replacement
Results
Winnetka, IL

CPS Nixon Elementary School - MEP
Results
Chicago, IL 60639

2021 Gymnasium Boiler Replacement
Post-Bid
Palatine, IL

CPS Jackson M ES & Joplin ES MEP
Results
Less than $9,000,000 est. value
Chicago, IL 60620

Police/Fire Station Boiler Replacement
Post-Bid
Hinsdale, IL 60521

CPS Mason MEP
Results
Chicago, IL 60629

Prairie Lakes Boiler Replacement
Post-Bid
$5,000,000 est. value
Des Plaines, IL 60016

CPS Simeon Hot Water Heater Replacement
Results
Chicago, IL

Mechanical Work at Multiple Sites
Post-Bid
Wheeling, IL

CPS Mather Boiler
Results
Chicago, IL 60659

Boiler Preparation - Tune-Up and Shut-Down Authority Wide
Term Contract
Post-Bid
IL

CPS Thorp Domestic Cold-Water Booster System
Term Contract
Results
Chicago, IL

Boiler Refurbishment at Barrington High School
Alteration
Post-Bid
Arlington Heights, IL

Last Updated 08/17/2022 12:09 PM
Project Title

2022 Mechanical Equipment Pre-purchase at Conant High School

Physical Address View project details and contacts
City, State (County) Hoffman Estates, IL 60169   (Cook County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Township High School District 211 and The Board of Education will receive. A Bid Security of 10% of the Bid is required with the proposal. The Contractor must pay the Prevailing Wage Rates for all work per Illinois Law. It is the policy of Township High School District 211 to provide equal opportunity to all qualified businesses in the awarding of contracts and accordingly promotes the utilization of diversified businesses to the maximum extent feasible in any contract issued against this solicitation to bid. The Owner reserves the right to reject any or all Bids, to waive irregularities in the bidding procedure, or accept the Bid that in its opinion will serve its best interest. Any such decision shall be considered final. The Owner reserves the right to set aside a Bid from a Contractor who, in the Owner's opinion, does not exhibit past experience equal to the size and scope of this project. PREVAILING WAGE LAW: This Contract calls for the construction of a "public work," within the meaning of the Illinois Prevailing Wage Act, 820 ILCS 130/.01 et seq. ("the Act"). The Act requires contractors and subcontractors to pay laborers, workers and mechanics performing services on public works projects no less than the current "prevailing rate of wages" (hourly cash wages plus amount for fringe benefits) in the county where the work is performed. The Department publishes the prevailing wage rates on its website. The Department revises the prevailing wage rates and the contractor/subcontractor has an obligation to check the Department's web site for revisions to prevailing wage rates. For information regarding current prevailing wage rates, please refer to the Illinois Department of Labor's website. All contractors and sub-contractors rendering services under this contract must comply with all requirements of the Act, including but not limited to, all wage, notice and record keeping duties. The bidder shall have a written sexual harassment policy in place in full compliance with Section 2-105 of the Illinois Human Rights Act.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents