Similar Projects
AutoZone #6031
New Construction - 6,000 SF
Conception
$500,000 to $1,000,000 est. value
Fresno, CA 93705

O'Reilly Auto Parts (F13)
New Construction - 6,800 SF
Conception
$500,000 to $900,000 est. value
Fresno, CA

AutoZone #3602
New Construction - 6,000 SF
Design
$500,000 to $1,000,000 est. value
Fresno, CA 93722

O'Reilly Auto Parts (F12)
New Construction - 6,800 SF
Design
$500,000 to $900,000 est. value
Fresno, CA

JD Sports
Renovation - 7,992 SF
Post-Bid
Fresno, CA 93710

Quay - Fresno Fashion Fair
Renovation - 1,660 SF
Post-Bid
$200,000 est. value
Fresno, CA 93710

Walmart Supercenter #1882-240 - Rm-1
Renovation - 103,340 SF
Construction
Selma, CA 93662

America's Tire - Clovis
Renovation - 10,846 SF
Construction
Fresno, CA 93704

Tillys
Renovation, Addition - 6,600 SF
Pending Verification
$250,000 est. value
Sacramento, CA 95832

7-Eleven #1042810 / Fresno
New Construction, Infrastructure - 3,131 SF
Pending Verification
$850,000 CJ est. value
Fresno, CA 93702

Sam's Club #4704-217 - GS
Renovation - 132,792 SF
Design
Fresno, CA 93720

Pep Boys #668
Build-Out
Post-Bid
$500,000 est. value
Clovis, CA 93612

The Arthur at Blackstone
New Construction, Infrastructure - 14,000 SF
Construction
$24,000,000 CJ est. value
Fresno, CA 93703

The Glenn Mixed-Use
New Construction, Infrastructure
Pending Verification
$46,396,000 CJ est. value
Fresno, CA 93704

Walmart Supercenter #2985-246 - CSP
Renovation - 176,965 SF
Design
Fresno, CA 93650

Last Updated 12/20/2022 12:02 AM
Project Title

Walmart Supercenter #2985-244 - Remodel / Fresno

Physical Address View project details and contacts
City, State (County) Fresno, CA 93650   (Fresno County)
Category(s) Commercial
Sub-Category(s) Retail
Contracting Method Bids by Invitation
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $2,385,465 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

This project has been awarded.* *Due to the direct relationship with Walmart, the only project contacts are the general contractors invited to bid. At this time Walmart works with a select group of pre-approved general contractors. Walmart is not accepting new general contractor qualifications at this time.

Details

1 Story Above Grade, 30,000 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents