Similar Projects
Dutch Buffalo Dam Repairs
Bidding
Mount Pleasant, NC 28124

Crabtree Creek Site 22B Lake Lynn Renovation
Renovation
Bidding
Raleigh, NC

Princeville Levee Repairs
Post-Bid
$500,000 to $1,000,000 est. value
Princeville, NC

Rim Lake Dam Slide Gate Replacement
Post-Bid
Fayetteville, NC 28304

Stormwater Control Measures and Dam Maintenance
Results
Cary, NC

Z--Project 659-19-117 (VA-19-00055), Halls & Flooring Multiple Campus Buildings
Renovation
Results
$500,000 to $1,000,000 est. value
Salisbury, NC 28144

Jessup's Mill Pond Dam Repair Project
Post-Bid
Raleigh, NC 27699

Lake Benson Dam Improvements
Results
Raleigh, NC

Lake Tabor Dam Spillway Repairs Project
Post-Bid
Tabor City, NC 28463

Fabrication of Hydraulic Steel Structures for Falls and Jordan
Results
NC

Reservoir System Monitoring
Post-Bid
Raleigh, NC 27632

Neuse River-Goldsboro Section 1135
Results
$5,000,000 to $10,000,000 est. value
Goldsboro, NC 27530

Princeville Levee Repair Contract #1
Post-Bid
$5,000,000 to $10,000,000 est. value
Princeville, NC

USS NC Battleship Phase 2 Hull Repairs
Results
Less than $2,500,000 est. value
Wilmington, NC 28401

Princeville Levee Repair Contract #2
Post-Bid
$10,000,000 to $25,000,000 est. value
Princeville, NC

Reported 04/06/2021 12:00 AM
Project Title

Dam Remote Valve Operation System

Physical Address View project details and contacts
City, State (County) Raleigh, NC   (Wake County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Remote Operation of City owned dams is desired. Product needed to operate from a remote location to open and close the bottom drain valve. Off the grid power is needed, cell communication, and security camera(s) needed at each dam site. One system is needed at Carolina Pines dam located on Carolina Pines Ave. Another system is needed at Lower Longview Dam which is located on Albemarle Avenue.

Details

Dam/Tunnel, Addition.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents