Similar Projects
Business Hwy 141 (County Rd CP) Road Repairs
Post-Bid
WI

South 5th Road Improvements
Infrastructure
Post-Bid
Coleman, WI 54112

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Pembine - Niagara, Crain Lane
Results
Niagara, Pembine, WI

Paving 5th Road
Infrastructure
Post-Bid
WI

Dunbar - Pembine, CTH O - USH 141
Results
Dunbar, Pembine, WI

Pulverizing
Infrastructure
Post-Bid
Amberg, WI 54102

Coleman Elm Drive Roadway Construction
Results
Coleman, WI 54112

Merryman Street and Pernin Street Reconstruction
Infrastructure
Post-Bid
Marinette, WI 54143

Colfax Street and Utility Reconstruction
Results
Marinette, WI 54143

2022 Pavement Improvements
Infrastructure
Post-Bid
$150,000 est. value
Crivitz, WI 54114

Dunlap Avenue Street and Utility Reconstruction
Results
Marinette, WI 54143

Chip Seal on Sections of North 13th Road
Infrastructure
Post-Bid
$200,000 est. value
Pound, WI 54161

Mill Street and Utility Reconstruction
Results
Marinette, WI 54143

Reconstruction on a South 31st Road
Infrastructure
Post-Bid
$200,000 est. value
Coleman, WI 54112

Last Updated 07/26/2022 05:09 PM
Project Title

Hot and Cold Mix Asphalt Shouldering Included River Drive

Physical Address View project details and contacts
City, State (County) Porterfield, WI 54143   (Marinette County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Approximately 1.0 miles in length. Fine grade and blacktop with 2" compressed thickness 20' wide. Shoulders to be 2' wide using 3/4" limestone compacted. Limestone to be purchased by the Town on a per ton basis. Asphalt to be purchased by the ton. Paving to be completed by September 15, 2022. Traffic control is the responsibility of the contractor. Bidder must have proof of insurance. The Town reserves the right to accept or reject any or all bids. Any Questions call Dennis Bergesen 715-923-6535

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents