Similar Projects
HVAC Equipment, Supplies and Installation
Bidding
Austin, TX 78759

HVAC Upgrade, Flight Services
Bidding
Less than $293,000 est. value
Austin, TX 78744

Electrical and HVAC Improvements, TXDOT Flight Services
Post-Bid
Less than $990,000 est. value
Austin, TX

COA Austin Energy ACC Highland Chilled Water Plant
Post-Bid
Less than $28,000,000 est. value
Austin, TX 78752

HVAC Control System Replacement Project
Results
Pflugerville, TX

Emergency HVAC Replacement
Results
Austin, TX

CCRC Walk-in Cooler/Freezer
Bidding
Austin, TX 78756

Preventive Maintenance, Inspection, and Repair Services of Chilled Water Systems and Associated Equi
Post-Bid

HVAC Filter Replacement
Results
Austin, TX

Facility Maintenance and Repair to Include HVAC, Electrical and Plumbing Services
Term Contract
Post-Bid

Chiller and Cooling Tower Maintenance
Term Contract
Results
Less than $420,000 est. value
TX

Cooling Tower and Chiller Replacement Project
Post-Bid
Less than $545,986 est. value
Austin, TX 78756

HVAC Equipment Replacement
Results
$153,376 est. value
Austin, TX

3 Testing Adjusting and Balancing for HVAC Package
Post-Bid
Austin, TX 78738

HVAC Maintenance
Term Contract
Results
TX

Last Updated 12/19/2018 10:04 AM
Project Title

HVAC and Electrical Improvements at Hill Elementary School

Physical Address View project details and contacts
City, State (County) Austin, TX 78759   (Travis County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $554,706
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description a. Remove 100% OA RTU and ground source heat pumps serving Building B and remove all associated ductwork. Replace with DX rooftop, triple deck, multi-zone unit and route new ductwork to each zone. New gas piping shall be routed from Main Building to new RTU. b. Provide new exhaust system to serve Building B. c. Remove and replace lay-in ceiling in Building. Remove and reinstall existing lighting in Building B. d. Patch and repair exterior and interior walls, flooring, hard ce ilings as required for HVAC replacements. e. Provide new Tridium BACnet control system to serve new RTU replacements. (Existing Campus Control System shall remain to serve existing equipment).
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents