Similar Projects
Pump Maintenance, Repair and Installation Services
Infrastructure
Bidding
Baltimore, MD

Pump Maintenance Repair and Installation Services
Term Contract, Infrastructure
Bidding
Less than $100,000 est. value
Baltimore, MD

Well Services
Term Contract
Post-Bid
Annapolis, MD 21401

By-Pass Pumping Services
Term Contract
Post-Bid
Laurel, MD 20707

Boonsboro High Irrigation Well(s)
Results
Boonsboro, MD 21713

4510--Basin Sludge Pump Replacement Tiered Evaluations SDVOSB, VOSB, Small Business, Large
Results
Perry Point, MD

Waste Storage System Services
Term Contract, Alteration
Bidding
Aberdeen Proving Ground, MD

Install Domestic Well (Office) at Manning Fish Hatchery
Post-Bid
Less than $100,000 est. value
Brandywine, MD 20613

Pump Maintenance, Repair and Installation
Results
Laurel, MD 20707

Shafer Park Well Replacement
Post-Bid
Boonsboro, MD 21713

Replace Water Well, Deal Island Shellfish Facility, Somerset County
Results
Deal Island, MD 21821

H145--Repair Aurora Sump Pump and Motor
Term Contract
Post-Bid
Baltimore, MD 21201

Rehabilitation of Park Well 7B and Well 15A
Results
Salisbury, MD

ASIS - Rehab Island Water Well #1
Alteration
Post-Bid
Less than $25,000 est. value
Berlin, MD 21811

Pump, Motor and Mechanical Equipment Maintenance Services
Term Contract
Results
Bel Air, MD 21014

Last Updated 01/12/2022 01:20 PM
Project Title

Hoods Mill Well Drilling and Testing Services

Physical Address View project details and contacts
City, State (County) Woodbine, MD 21797   (Carroll County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Four six-inch diameter test wells, then reaming out and completing the best yielding well as an 8-inch diameter steel production well (herein referred to as production well). Any other test well will be completed as a 6-inch diameter PVC monitoring well (herein referred to as monitoring well), unless County personnel otherwise direct that a boring be abandoned. Thereafter, and following adequate well development, aquifer testing on the newly completed production well is planned, with water level monitoring of the 6-inch diameter PVC monitoring wells. At minimum, the proposed work will entail drilling up to four 6-inch diameter PVC test wells, converting one test well into an 8-inch diameter steel production well completed with cement grout, well development of the future production well and any permanent monitoring wells, one full day of step-drawdown testing services and a fully manned 96-hour constant rate aquifer test on the production well.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents