Similar Projects
Vendor Lists
Alteration
Design
Newfield, ME

RFP Design - Professional Services for a Traffic Safety and Ancillary Improvements for Route 100
Infrastructure
Bidding
$700,000 CJ est. value
Cumberland, ME 04105

RFP - Structural Engineering Consulting Services
Term Contract
Bidding
Sanford, ME 04073

Snow Plow
Term Contract
Sub-Bidding
Parkman, ME 04443

Facility Investment Services for Commercial Building Services
Term Contract
Sub-Bidding
Kittery, ME 03904

Portable Toilets
Post-Bid
Wells, ME

On-Call Services for General Facilities & Mechanical Maintenance
Post-Bid
Less than $50,000 est. value

Crane Services to Launch Marina Docks
Term Contract
Results
Bangor, ME

Septic Tank / Vault Toilet Pumping and Disposal Services
Term Contract
Results
Campton, Gorham, NH 03581

Winter Sand
Term Contract
Sub-Bidding
Richmond, ME 04357

On-Call Services for General Facilities and Mechanical Maintenance
Post-Bid
Less than $50,000 est. value

Graffiti Removal Services
Alteration
Results
Portland, ME

Snow Removal and Sanding for the 2022-23 School Year
Term Contract
Sub-Bidding
Oakland, ME 04963

Herbicide Application State Railroads
Post-Bid

Plow and/or Remove Snow for the City of Portland
Term Contract
Sub-Bidding
Portland, ME 04101

Last Updated 09/07/2022 10:09 AM
Project Title

Apparatus Floor Resinous Flooring Resurfacing

Physical Address View project details and contacts
City, State (County) Biddeford, ME 04005   (York County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

furnishing the Biddeford Fire Department with resurfacing the apparatus floor with resinous flooring. All bids shall be submitted on the bid form provided on this page. Bidders shall attach to the bid form a detailed description of the items proposed, including specification, standard features, optional equipment, and warranties. All exception to the bid specification shall be listed on the provided bid form in the area provided for exceptions. Bidders shall quote prices that include shipping charges. No proposal may be withdrawn within sixty (60) days after date of opening thereof. Submittals shall include acknowledgment of the City of Biddeford Indoor Air Quality (IAQ Guide) Construction Control Guide and shall prepare and submit the IAQ Construction Containment Planning Checklist, or equivalent, no later than the scheduled pre-application meeting and shall comply with the IAQ Guide throughout the project. Biddeford Fire Department will select the bidder that best meets the needs of the Fire Department. In evaluating bids, the Fire Department will consider the price, quality, warranty, specific features of the equipment proposed, the bidder's location, and the time of delivery. The Fire Department reserves the right to reject any or all bids, to wave informalities in the bidding process, and to negotiate specific terms of the bid. Biddeford Fire Department will issue a purchase order to the successful bidder to indicate the award of the contract to furnish the system. Questions regarding this bid should be addressed to Chief Scott Gagne at 207-282-6632.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents