Similar Projects
The Gables On Lawrence
New Construction, Infrastructure
Conception
$51,000,000 CJ est. value
Fairhope, AL 36532

U-Haul Self-Storage Facility / Daphne
New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
Daphne, AL 36526

Skyline Village Townhomes
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fairhope, AL 36532

Orange Beach Medical Plaza
New Construction, Infrastructure - 11,000 SF
Design
$6,400,000 CJ est. value
Orange Beach, AL 36561

I-10 Lift Station Modifications
Renovation, Infrastructure
Bidding
$600,000 CJ est. value
Daphne, AL 36526

Sidewalk Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Elberta, AL 36530

Construction of Improvements to Jack Edwards National Airport
Post-Bid
Gulf Shores, AL 36542

Provision of Labor and Equipment for Asphalt Placement
Infrastructure
Post-Bid
AL

Orange Beach High School Turnout
Infrastructure
Results
$58,891 est. value
Orange Beach, AL 36561

Access Road for Proposed Diamante Well
Infrastructure
Results
$89,530 est. value
Daphne, AL

Beef O' Bradys / Spanish Fort
New Construction, Infrastructure - 6,000 SF
Construction
$2,000,000 CJ est. value
Spanish Fort, AL 36527

Aldi / Daphne
New Construction, Infrastructure
Pending Verification
$3,500,000 CJ est. value
Daphne, AL 36526

Palmetto Ridge Townhouses
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Gulf Shores, AL 36542

The Noble at Daphne
New Construction, Infrastructure
Design
$32,000,000 CJ est. value
Daphne, AL 36526

Resurfacing Projects 2023 - Group 1/BCR-2023-1
Infrastructure
Bidding
$900,000 CJ est. value
Bay Minette, AL 36507

Last Updated 01/09/2023 10:09 AM
Project Title

Taxiway - City of Foley

Physical Address View project details and contacts
City, State (County) Foley, AL 36535   (Baldwin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2020
Bids Due View project details and contacts
Estimated Value $305,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 1, 2019 , the project is in early planning. Information regarding an architect and general contractor has not yet been disclosed. A timeline for construction has not been established at this point. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents