Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$460,000 CJ est. value
Scott, PA 17815

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$460,000 CJ est. value
Scott, PA 17815

SR 4033 over Branch Pine Creek
Infrastructure
Design
$1,097,850 CJ est. value
Bloomsburg, PA 17815

SR 4033 over Branch Pine Creek
Infrastructure
Design
$1,097,850 CJ est. value
Bloomsburg, PA 17815

SR2002 ov Long Brook
Infrastructure
Bidding
$500,000 CJ est. value
Jackson Township, PA 17814

Seal Coat Contract
Post-Bid
Benton, PA 17814

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Seal Coat Project
Results
Millville, PA 17846

UPM Cold Patch
Results
Catawissa, PA

Us 22/322 Pm
Infrastructure
Conception
$2,850,000 est. value

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$2,139,878 CJ est. value
Franklin Township, PA 16001

Seal Coat Contract
Infrastructure
Post-Bid
Catawissa, PA

Road Repairs Contract
Results
Catawissa, PA 17820

SR 487 over Abandoned RR
Alteration
Conception
$1,920,000 est. value
Bloomsburg, PA 17815

SR 1003 - Brady Twp Line to SR 1001
Infrastructure
Design
$2,899,132 CJ est. value
Henderson Township, PA 16652

Last Updated 10/11/2022 12:08 PM
Project Title

Mercer Street Outfall Repair Project

Physical Address View project details and contacts
City, State (County) Bloomsburg, PA 17815   (Columbia County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $85,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work comprises the removal of the deteriorated CMP stormwater pipe at the Mercer Street outfall to the terra cotta plank pipe. Over excavation of the pipe is required in order to pour a cast in place concrete collar at the joint where the new RCP stormwater pipe abuts the existing terra cotta stormwater pipe, and the existing headwall will need to be enlarged so the RCP pipe can be installed and then grouted on both sides after the stormwater pipe is installed, including all appurtenances, as shown on the construction drawings and in accordance with the Contract Documents. Clarification Deadline 10/6/2022 12:00 PM The deteriorated CMP stormwater pipe at the Mercer Street outfall is to be removed to the terra cotta plank pipe, over excavation of the pipe is required in order to pour a cast in place concrete collar at the joint where the new RCP stormwater pipe abuts the existing terra cotta stormwater pipe, the existing headwall will need to be enlarged so the RCP pipe can be installed and then grouted on both sides after stormwater pipe is installed as shown on the construction drawings and in accordance with the Contract Documents.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents