Similar Projects
22nd Street North East and B Avenue Intersection
Conception
$150,000 est. value
Cedar Rapids, IA 52402

9Th Avenue South East Improvements from 3rd Road Street to Railroad
Conception
$200,000 est. value
Cedar Rapids, IA 52407

Edgewild Dr Pavement Reconstruction
Infrastructure
Bidding
Davenport, IA 52807

PCC Overlay - IOWA 31
Infrastructure
Bidding
IA

Storm Water Discharge
Infrastructure
Post-Bid
Dubuque, IA 52003

HMA Resurfacing
Infrastructure
Post-Bid
IA

Marshall Street Reconstruction 2021 Washington Street to Jefferson Street
Results
$510,000 est. value
Prairie City, IA 50228

East 2nd Street Reconstruction from East Court Avenue to Iowa Interstate Railroad
Infrastructure
Results
$1,177,500 est. value
Des Moines, IA

Ingleside Drive South West Pavement Improvements
Conception
$250,000 est. value
Cedar Rapids, IA 52404

HMA Resurfacing with Milling - B55, B20
Infrastructure
Bidding
IA

County Road Improvements
Infrastructure
Post-Bid
IA

2021 Street Improvements
Infrastructure
Results
$178,000 est. value
Hiawatha, IA 52233

32nd Street North East from Carlisle Street through Oakland Road Pavement Reconstruction
Conception
$2,000,000 est. value
Cedar Rapids, IA 52402

PCC Patching - IOWA 9
Infrastructure
Bidding
IA

Well 5 Reconfiguration
Infrastructure
Post-Bid
$129,300 est. value
Waverly, IA 50677

Last Updated 03/04/2022 09:53 AM
Project Title

250th Avenue Reconstruction

Physical Address View project details and contacts
City, State (County) Pella, IA 50219   (Marion County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $429,776
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Excavation, Class 10 - 1,580 CY; Subgrade Preparation (12" Thick) - 3,885 SY; Subbase, Modified - 3,885 SY; Compaction Testing - Lump Sum; Storm Sewer, Trenched, SDR 23.5 PVC, 6" - 107 LF; Removal of Storm Sewer, All Types, <36" - 109 LF; Pipe Culvert, Trenched, RCP, 18" - 96 LF; Pipe Apron, RCP, 18" - 2 EA; Pavement, PCC, 8" Thick - 3,400 SY; PCC Pavement Samples and Testing - Lump Sum; Removal of Driveway - 272 SY; Driveway, Paved, PCC, 6" Thick - 126 SY; Type B Granular Shoulder - 270 TON; Temporary Granular Access Drive - 125 TON; Pavement Removal - 2,845 SY; Painted Pavement Markings, Solvent/Waterborne - 2.75 STA; Temporary Traffic Control - Lump Sum; Hydraulic Seeding, Seeding, Fertilizing, and Mulching - Lump Sum; SWPPP Preparation - Lump Sum; SWPPP Management - Lump Sum; Silt Fence - 750 LF; Silt Fence, Removal of Sediment - 750 LF; Silt Fence, Removal of Device - 750 LF; and Mobilization - Lump Sum.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents