Similar Projects
RFQ - On-Call Civil Engineering, Environmental, and Right of Way Professional Services
Term Contract
Conception
Hayward, CA 94541

RFQ - On-Call Civil Engineering, Environmental, and Right of Way Professional Services
Term Contract
Conception
Hayward, CA 94541

Village Green Apartments
New Construction, Infrastructure - 12,000 SF
Design
$42,000,000 CJ est. value
San Lorenzo, CA 94580

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Water Pollution Control Plant Dirt Relocation 2021
Infrastructure
Bidding
$4,000,000 CJ est. value
San Leandro, CA 94577

Merritt College New Landscape Horticulture Complex Project
Addition, Demolition, Renovation, Infrastructure
Bidding
$21,200,000 CJ est. value
Oakland, CA 94619

As Needed Asphalt and Concrete Services
Term Contract
Sub-Bidding
Oakland, CA 94612

Highway Safety Improvement Program HSIP 8 Oakland Hills
Infrastructure
Post-Bid
Oakland, CA

Roadway Repairs
Infrastructure
Post-Bid
Cloverdale, Fremont, CA 95425

Accessible Improvement Program - Phase 1
Infrastructure
Results
$1,000,000 to $5,000,000 est. value
Oakland, CA

Excavation, HMA, Structural Concrete, Minor Concrete and Drainage
Infrastructure
Results
$23,400,000 est. value
CA

Admirals Cove Infill
Demolition, New Construction, Infrastructure - 646,580 SF
Pending Verification
$72,011,310 CJ est. value
Alameda, CA 94501

EmeryStation Overland
Demolition, New Construction, Renovation, Infrastructure - 413,325 SF
Pending Verification
$63,900,000 CJ est. value
Emeryville, CA 94608

40th-San Pablo Transit Hub and 40th Street Reconstruction - City of Emeryville
Infrastructure
Conception
$10,787,000 est. value
Emeryville, CA 94608

Grayson Street Life Sciences Facility Development
New Construction, Infrastructure - 187,000 SF
Design
$63,000,000 CJ est. value
Berkeley, CA 94710

Last Updated 08/10/2022 11:37 AM
Project Title

Joy Way Reconstruction Project

Physical Address View project details and contacts
City, State (County) Portola, CA 96122   (Plumas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $2,209,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

General work description: Remove and Reconstruct Joy Way roadway with HMA over AB. Remove and construct new concrete sidewalk, curb ramps, retaining wall and pedestrian cross walks. Relocate/construct water services, sewer facilities and drainage facilities as noted on the plans. Proposal forms for this work are included herein in the bid documents. It is not necessary to submit the entire set of specifications with your bid. Your proposal shall be submitted in a sealed envelope plainly marked on the outside with project name, project number, bid opening date, and time of bid opening. A bidder's checklist has been provided to assist bidders in completing the bid documents to avoid potentially non-responsive bids; however, the checklist may not completely address all requirements of the bid invitation. Independent verification of required bid documents is the bidder's sole responsibility. At the time this contract is awarded, the Contractor shall possess either a Class A license or a combination of Class C-12 and C-32 licenses which constitutes a majority of the work and in good standing. The Contractor must also be properly licensed at the time the bid is submitted, except that on a joint venture bid a joint venture license may be obtained by a combination of licenses after bid opening but before award in conformance with Business and Professions Code, Section 7029.1. Bids are required for the entire work described herein. Bids must be on a unit price basis. Submit your bid with bidders security equal to at least 10 percent of the bid. This contract is subject to state contract nondiscrimination and compliance requirements pursuant to Government Code, Section 12990. Inquiries or questions based on alleged patent ambiguity of the plans, specifications or estimate must be communicated as a bidder inquiry prior to bid opening. Any such inquiries or questions, submitted after bid opening, will not be treated as a bid protest. Bidder inquiries shall be made in writing and shall be submitted to the Project Engineer by either e-mail or telephone: e-mail: bastianengineeringinc@gmail.com Telephone: 530-249-0468 The successful bidder shall furnish a payment bond and a performance bond. Prevailing wages are required on this Contract. The Director of the California Department of Industrial Relations (DIR) determines the general prevailing wage rates. Pursuant to Section 1773 of the Labor Code, the general prevailing wage rates in Plumas County have been determined by the Director of the California District of Industrial Relations. Obtain the wage rates at the DIR portal, or from the Departments Labor Compliance Office of the district in which the work is located. The Department has made available Notices of Suspension and Proposed Debarment from the Federal Highway Administration. For a copy of the notices, go to portal. Additional information is provided in the Excluded Parties List System at portal. Obtain the wage rates at the DIR portal. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 22 - Plumbing, Facility Storm Drainage.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Retaining Walls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents