Similar Projects
Walthall Schools Renovation Projects
Renovation
Conception
Tylertown, MS

Repairs And Renovations: Coahoma County School District Lyon, Jonestown, Friars Point Elementary Schools
Renovation
Design
$6,129,000 CJ est. value
Clarksdale, MS 38614

Entrance Modifications to Madison Avenue Lower Elementary School
Renovation
Bidding
$1,500,000 CJ est. value
Madison, MS 39110

Cleveland School District ESSER 3
Renovation
Bidding
$160,000 CJ est. value
Boyle, MS 38730

Marshall County School District ESSER II HVAC Renovations
Renovation
Sub-Bidding
$300,000 CJ est. value
Holly Springs, MS 38635

Holly Springs School District, District HVAC Improvements - ESSER II
Renovation
Sub-Bidding
$100,000 CJ est. value
Holly Springs, MS 38635

General Construction - Long Beach School District Hurricane Repairs
Post-Bid
Long Beach, MS 39560

New Classroom
New Construction
Post-Bid
Moss Point, Vancleave, MS 39562

Boyd Elementary School Restroom Renovations
Renovation
Results
Jackson, MS 39206

Smith Elementary School Renovations
Renovation
Results
Jackson, MS 39213

New Construction and Renovation for the Brookhaven School District
New Construction, Renovation, Addition - 6,399 SF
Construction
$4,000,000 to $5,000,000 est. value
Brookhaven, MS 39601

Restoration to Isaac Chapel Rosenwald School
Renovation
Construction
$425,000 est. value
Byhalia, MS 38611

Regents School Of Oxford
New Construction
Pending Verification
Oxford, MS

South Pike School District ESSER
Renovation
Bidding
$55,000 CJ est. value
Magnolia, MS 39652

Video Surveillance System Upgrade
Term Contract
Sub-Bidding
Lucedale, MS 39452

Last Updated 08/03/2022 11:56 PM
Project Title

East Corinth School HVAC, Plumbing, and Electrical Renovation

Physical Address View project details and contacts
City, State (County) Corinth, MS 38834   (Alcorn County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $825,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Corinth School District East Corinth School HVAC, Plumbing, and Electrical Renovation Corinth, Mississippi Bid preparation will be in accordance with Section 00 21 13 - Instructions to Bidders, bound in the Project Manual. Proposals shall be submitted with Proposal Security in the form of Certified Check or acceptable Bid Bond in an amount equal to at least five percent (5%) of the base bid; such security is to be forfeited as liquidated damages, not penalty, by any bidder who fails to carry out the terms of the proposal. The Bid Bond, if used, shall be payable to the Owner. Bonds on the project must be received on or before the period scheduled for the project and no bid may be withdrawn after the scheduled closing time for the project. Bids must be firm for a period of forty-five (45) days after the scheduled time of opening. A one hundred percent (100%) Performance-Payment Bond issued by a surety company authorized to do business in the State of Mississippi will be required within ten (10) days after the successful bidder has been notified of the award of the contract to him. All bids submitted by a prime or subcontractor for public works or public projects where said bid is in excess of fifty thousand dollars ($50,000.00) to perform contracts enumerated in Section 31-3-21, Mississippi Code of 1972, shall contain on the outside or exterior of the envelope or container of such bid the contractor's current certificate number. No bid shall be opened or considered unless such contractor's current certificate number appears on the outside or exterior of said envelope or container or unless there appears a statement on the outside or exterior of such envelope or container to the effect that the bid enclosed therewith does not exceed fifty thousand dollars ($50,000.00). When bids are submitted electronically, the requirement for including on the exterior of the bid envelope the contractor's current certificate of responsibility number or a statement that the bid enclosed does not exceed fifty thousand dollars ($50,000.00) shall be deemed fulfilled and the bid in compliance by including the same information as an attachment with the electronic bid submittal. The Owner reserves the right to reject any or all bids and to waive irregularities.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central HVAC Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents