Similar Projects
Orange Beach High School Turnout
Infrastructure
Bidding
Orange Beach, AL 36561

Baldwin County Resurfacing Projects 2020: Group 2
Post-Bid
AL

Roadway Improvements
Post-Bid
$195,000 to $225,000 est. value
Elberta, AL 36530

Southern Region Disaster Recovery Support BPA
Results

ADA Transition Plan Improvements within Baldwin County Row Phase II
Results
Less than $178,831 est. value
Bay Minette, AL 36507

Resurfacing 2020
Post-Bid
Foley, AL

Bay Minette Transportation Facility Resurfacing and Parking Improvements
Results
Bay Minette, AL 36507

FY 2020 Street Resurfacing
Post-Bid
Daphne, AL 36526

Constructing the Planing, Resurfacing, and Traffic Stripe on SR-3 (Us-31) from the Junction of Crosby Road in Bay Minette to the Escambia County Line
Results
$1,982,091 to $2,422,555 est. value
AL

Resurfacing of Various Roadways
Post-Bid
Elberta, AL 36530

South - Regional Construction MATOC
Results
$500,000 to $1,000,000 est. value

2021 Roadway Resurfacing
Post-Bid
Orange Beach, AL

Baldwin County Resurfacing Projects 2020 - Group 3
Results
AL

2021 Resurfacing Project Group B
Post-Bid
Elberta, Loxley, Robertsdale, AL 36551

ADA Transition Plan Improvements within Baldwin County ROW Phase III
Results
Bay Minette, AL 36507

Reported 05/13/2021 12:00 AM
Project Title

2021 Resurfacing Project

Physical Address View project details and contacts
City, State (County) Bay Minette, Daphne, Robertsdale, Spanish Fort, AL 36527   (Baldwin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of: Resurfacing, minor base repairs and new road and parking area construction for Spanish Fort High School, Pine Grove Elementary School, Daphne Middle School, and Rosinton Elementary School. Work items include 4,560 tons of Asphalt Wearing Surface, 180 tons of Asphalt Leveling, 500 tons of Asphalt Binder Layer, 10,200 square yards of Crushed Aggregate Base, Parking Striping, and Grading and Sodding of Shoulders

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents