Similar Projects
Last Updated | 08/23/2022 03:02 AM |
Project Title | Taylor Sportsplex Flooring |
Physical Address | View project details and contacts |
City, State (County) | Taylor, MI 48180 (Wayne County) |
Category(s) | Single Trades |
Sub-Category(s) | Flooring |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Taylor Sportsplex is looking for a flooring replacement in 2 upstairs conference rooms as well as 3 hockey locker rooms. 1. Rooms C & D (upstairs, conjoined conference rooms) - approximately 184 sq. yd's of Mannington Relay Modular carpet tile (color: Haptics) or equivalent product and approximately 240 ft. of Roppe 4" vinyl base (color: Black) or equivalent product. 2. Room E (upstairs) - approximately 95 sq. yd's of Mannington Relay Modular carpet tile (color: Haptics) or equivalent product and approximately 115 ft. of Roppe 4" vinyl base (color: Black) or equivalent product. 3. Back Locker Room (Belle Tire Boys Room) - approximately 899 sq. ft. of Nora Norament 992 Carpet Tile or equivalent product and approximately 240 ft. of Roppe 4" vinyl Base (color of these not yet determined.) 4. Back Locker Room (Belle Tire Girls Room 1) - approximately 527 sq. ft. of Nora Norament 992 Carpet Tile or equivalent product and approximately 120 ft. of Roppe 4" vinyl Base (color of these not yet determined.) 5. Back Locker Room (Belle Tire Girls Room 2) - approximately 478 sq. ft. of Nora Norament 992 Carpet Tile or equivalent product and approximately 120 ft. of Roppe 4" vinyl Base (color of these not yet determined.) Please include all labor Please include removal of existing carpet and base as well as installation Please include all adhesive cost *All measurements are approximate and supplier is responsible for all measurements. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % Question Acceptance Deadline 08/25/2022 10:00 AM EDT Questions are submitted online No |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |