Similar Projects
The Settlement
New Construction
Conception
Simpsonville, SC

Southern Commons - Master Plan
New Construction
Conception
Cayce, SC 29172

Long Savannah - Master Plan
New Construction
Design
Charleston, SC

Woods Crossing
New Construction - 8,400 SF
Design
$8,000,000 est. value
Greenville, SC

Catawba Park - Phase 1
New Construction
Bidding
$10,000,000 est. value
Tega Cay, SC

Brantley Park Phase I
New Construction
Bidding
Charleston, SC 29412

DB Walker Park Improvements
Post-Bid
Less than $125,000 est. value
Anderson, SC 29621

Repairs to Sand Volleyball Court
Post-Bid
Marion, SC 29571

Flat Stack Trail - Phase I
Results
$100,000 to $200,000 est. value
Lockhart, SC

Newberry High School Track and Field
Results
Newberry, SC 29108

St. Andrew By-The-Sea United Methodist Church Campus
New Construction
Construction
$755,000 est. value
Bluffton, SC 29910

The Waterfront
New Construction
Construction
Daniel Island, SC

Cornerstone
New Construction
Conception
Anderson, SC 29625

The Exchange at Old Town Depot
New Construction - 45,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Rock Hill, SC

District-Wide Playground Surfacing Material And Mulch
Renovation
Bidding
SC

Last Updated 03/03/2020 04:28 PM
Project Title

Resurfacing the Outdoor Running Track at Landrum High School (Remove Existing Surface)

Physical Address View project details and contacts
City, State (County) Campobello, SC 29322   (Spartanburg County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $135,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This section of specifications includes all labor, supervision, equipment, tools, materials and all other means of construction necessary for removal and proper disposal of existing track surface and to install a 1/2" polyurethane rubber running track resurfacing/reconditioning work as described, or as necessary to complete the work in a first class manner. This Section Includes: 1. Remove existing surface down to the asphalt 2. Preparing asphalt surfaces to receive polyurethane rubber surfacing 3. Applying surfacing 4. Applying track lines and symbols

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents