Similar Projects
Airline at Clearview Intersection Improvements
Infrastructure
Results
$5,000,000 to $7,500,000 est. value
New Orleans, LA 70119

Drainage Improvements to Lime Street
Infrastructure
Results
Gretna, LA

Nashville Wharf "A" Substructure Repairs Phase 2
Infrastructure
Post-Bid
New Orleans, LA

Manson Ditch Drainage Improvements
Infrastructure
Post-Bid
Gretna, LA

Lincoln Manor Drainage Improvements Project
Infrastructure
Results
Kenner, LA

West Shore Lake Pontchartrain, Bottomland Hardwood, Louisiana Project, CEMVN
Term Contract
Design
$10,000,000 est. value

Vulcan Street Drainage Improvements
Infrastructure
Post-Bid
Gretna, LA

Taxiway F Drainage Improvements
Infrastructure
Bidding
New Orleans, LA

Drainage Maintenance Construction Two (2) Year Contract
Term Contract
Results
Gretna, LA

LA 428: WB Lane at LA 23
Infrastructure
Results
$500,000 to $1,000,000 est. value
LA

Landbridge Shoreline Stabilization and Marsh Creation Project
Infrastructure
Post-Bid
$13,231,110 est. value
New Orleans, LA

Midway Drive Drainage Improvements (Jefferson Hwy. To Charlotte Dr.)
Infrastructure, Alteration
Bidding
Gretna, LA

Improvements to Bissonet Plaza Drainage Outfalls
Infrastructure
Results
Jefferson, LA

Avondale Phase II Seepage project
Term Contract
Results
$1,000,000 to $5,000,000 est. value
Avondale, LA

Emergency Ditch Culvert and Catch Basin Cleaning Jefferson
Infrastructure
Post-Bid
$1,000,000 to $2,500,000 est. value
LA

Last Updated 11/10/2021 10:12 AM
Project Title

Nov-Nf-W-05A.1, First Lift Levee & Drainage Canal Relocation Project

Physical Address View project details and contacts
City, State (County) New Orleans, LA   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000,000 to $250,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The U.S. Army Corps of Engineers, Vicksburg District has been tasked to solicit and award one (1) firm fixed-price construction contract. New Orleans to Venice, NOV-NF-W-05a.1, First Lift Levee and Drainage Canal Relocation Project La Reusitte to Myrtle Grove, Plaquemines Parish, Louisiana. Contractors would be required to furnish all plant, labor, materials, and equipment for performing construction of clearing, grubbing, excavation for new drainage canals, new culvert placements, new drainage structure placement, new T-walls, new levee ramp crossings embankment placement for levees, geotextile, turf establishment, surfacing and all other related incidental work. (The estimated time of completion is 1,302 calendar days after receipt of notice to proceed).

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents