Similar Projects
2022 and 2023 Citywide Sidewalk
Post-Bid
$969,502 est. value
Saint Louis, MO

Improving Mueller Road
Infrastructure
Post-Bid
Green Park, MO 63123

Spanish Pond ADA Improvements
New Construction
Results
MO 63138

Repave Streetscape at Justice Center
Results
Ballwin, MO 63011

Olivette Apartments
New Construction, Alteration
Pending Verification
Olivette, MO 63132

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

FY22-FY26 On-Call Paving
Term Contract
Results
Olivette, MO

Installation of a Walking Track
Infrastructure
Post-Bid
Overland, MO

Holloway Road Improvements
Results
Ballwin, MO 63011

Parking Lot Rehabilitation
Infrastructure
Post-Bid
Chesterfield, MO 63005

McGrath Elementary School and ECC Sitework Package
Results
Brentwood, MO 63144

Saint Vincent Greenway: Trojan Park to Robert L. Powell Place
New Construction, Infrastructure
Post-Bid
Saint Louis, MO 63133

Parks Parking Lots and Trail Sealing
Results
Maryland Heights, MO

Rehabilitation of Abandoned Property
Renovation, Infrastructure
Post-Bid
Ferguson, MO

Asphalt Overlay Improvements
Results
University City, MO

Last Updated 07/22/2022 10:31 AM
Project Title

Midland Boulevard (West) Resurfacing

Physical Address View project details and contacts
City, State (County) Saint Louis, MO 63114   (Saint Louis County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $4,470,000 [brand] Estimate
Plans Available from Copy Center - 05/16/22
Owner View project details and contacts
Architect View project details and contacts
Description

St. Louis County Project No. AR-1472 consists of the removal and replacement of deteriorated and/or damaged pavement and shoulders, curb, curb & gutter, driveway approaches, curb ramps, sidewalk, signal detector loops, pavement surfacing and texturing, and Superpave asphaltic concrete overlay along approximately 2.77 miles of roadway within St. Louis County and other incidental items necessary to complete the above in a workmanlike manner Pursuant to Sections 107.400 and 107.401 SLCRO, all County solicitations, once published, are under a Cone of Silence. All communication from a Vendor or a Vendors Representative relating to this solicitation must follow the processes defined herein. Any communication with other County staff regarding this solicitation is prohibited except the specific types of communication defined in Section 107.401 SLCRO. The Cone of Silence shall terminate at the time a contract resulting from the solicitation is executed or when all bids or proposals in response to the solicitation are rejected by the County. Violation of Section 107.401 SLCRO by a Vendor or Vendors Representative shall result in designation by the Director of Procurement of the bid, proposal, or statement of qualifications as non-responsive Communications regarding this solicitation are authorized only with the following County Staff. In addition, County clerical staff are permitted to route communications, including phone calls and written communications. Communications prior to the bid opening shall be by email only. Communications after the bid opening with authorized staff related to contract negotiations, investigations into contractor capability or the preparation for construction activities may be verbal or written All questions must be submitted by 5:00 pm on June 8, 2022 via e-mail to the Project Manager. The successful Bidder or Bidders shall be required to comply with the most current applicable State statutory provisions concerning the payment of prevailing wages on public works, Section 290.210 through 290.340 R.S. Mo. 1959, as amended. St. Louis County hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award. Pursuant to SLCRO 107.071, the County has established the following Minority and Woman-owned Business Enterprises (M/WBE) and Workforce Participation Goals: M/WBE Goals MBE Goal: 24% Workforce Goals Minority Participation Goal: 25% WBE Goal: 9.5% Female Participation Goal: 7% County Resident labor goal: 23% Bids must be accompanied by a certified check or bidders bond in an amount equal to 5% of the total bid. All checks shall be made payable to Treasurer, St. Louis County. The right is reserved by the County Council to reject any or all bids.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents