Similar Projects
Red Del Papa Well House (IF) - 731130 - City of Tooele
New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Tooele, UT 84074

Townhomes on Willow
New Construction, Infrastructure
Conception
$37,000,000 CJ est. value
Grantsville, UT 84029

AutoZone #5860 / Stansbury Park
New Construction, Infrastructure - 6,500 SF
Design
$1,500,000 CJ est. value
Stansbury Park, UT 84074

Fire Station Building 3 - City of Tooele
New Construction, Infrastructure - 15,000 SF
Design
$4,000,000 CJ est. value
Tooele, UT 84074

Tooele County Road Department Tenant Improvement Project
New Construction, Infrastructure
Bidding
$290,000 CJ est. value
Tooele, UT 84074

2023 Roadway Maintenance Project
Infrastructure
Bidding
$330,000 CJ est. value
Tooele, UT 84074

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Installation of the Dow James Pressure Regulating Valve (PRV) and Meter Vault Project
Infrastructure
Post-Bid
Tooele, UT

Park Well House and Waterline
Infrastructure
Results
$2,376,624 CJ est. value
Tooele, UT 84074

Park Well House and Waterline
Infrastructure
Results
$2,376,624 CJ est. value
Tooele, UT 84074

Boyer Lakeview One / Grantsville
New Construction, Infrastructure - 500,000 SF
Construction
$106,000,000 CJ est. value
Grantsville, UT 84029

Western Acres Phase 1
New Construction, Infrastructure
Construction
$50,000,000 CJ est. value
Tooele, UT 84074

Tagg N Go Car Wash / Tooele
New Construction, Infrastructure - 55,756 SF
Pending Verification
$1,000,000 CJ est. value
Tooele, UT 84074

Breezeway Apartments
New Construction, Infrastructure
Pending Verification
$8,000,000 CJ est. value
Tooele, UT 84074

MUNI - Subdivision - Residential Subdivision / 600 East 2400 North - Cook Builders
New Construction, Infrastructure
Design
Tooele, UT 84074

Last Updated 06/27/2023 03:01 PM
Project Title

Jacob City Fire – Phase 2 Project

Physical Address View project details and contacts
City, State (County) Tooele, UT 84074   (Tooele County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This Project consists of the construction of (2) low water crossings and 3-4 post assisted log structures (PALS). The low water crossings have (2) corrugated 36 diameter pipes in the upstream crossing and (2) corrugated 48 pipes in the lower crossings. Both crossings will have riprap before and after the crossing's length and widths as shown on the construction drawings. Concrete pads are also to be provided as shown on the construction drawings. The principal items of work are as follows: The existing culverts shall be removed, pipe alignment will be cleared and grubbed with the unacceptable material being properly disposed of offsite. The new pipe alignment will be excavated to sub-grade with any excess material will either be used on-site or be properly disposed of offsite, the sub-grade will be graded and shaped to proper profile per the plans and then compacted, any soft sub-grade areas will be stabilized, then additional Granular Borrow Material will be imported and placed and will then be properly compacted to line and grade as select borrow embankment material. Proposed culverts shall be properly placed and structural fill shall be placed in lifts around the proposed culverts Also included is new signage or relocated signage. Some relocation or adjustment to any utility boxes to new finish grade are also included along with fencing removal and installation of new field fencing per County Standard. The project is to be completed within 90 calendar day The County reserves the right to reject any and all bids. No bidder shall have any right, legal or equitable, or claims against the County for any expenses or costs incurred by him in the preparation or submission of his bid, which is rejected, regardless of the reason of rejection.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents