Similar Projects
Housing Rehabilitation Program Single Family - Wawayanda - Emergency Roof
Alteration
Bidding
Middletown, NY

Awning Replacement
Post-Bid
Goshen, NY 10924

Roof Replacement and Window and Siding Replacement - Capital Fund Program - 2018/2019
Post-Bid
Port Jervis, NY 12771

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Roofing MACC
Post-Bid

Emergency Roof Repair Service
Results
West Point, NY

Roofing Repair and Maintenance
Post-Bid

Stone Wall and Concrete Cap Repair
Results
Middletown, NY 10940

Roofing Work Contract
Alteration
Post-Bid
Kiryas Joel, NY

Kaplan Hall Facade Repair
Results
Middletown, NY 10940

Roof Repair
Alteration
Post-Bid
Goshen, NY

Roof Repair
Results
Goshen, NY 10924

Horton Hall Stone Wall and Concrete Cap Repair at OCCC
Alteration
Post-Bid
NY

Ellison House Roof Replacement
Results
$100,000 to $125,000 est. value
New Windsor, NY

Last Updated 09/24/2021 08:05 AM
Project Title

Porch Replacement and New Roof, Park Residence P-09, Bear Mountain State Park

Physical Address View project details and contacts
City, State (County) Highland Falls, NY 10928   (Orange County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior, Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $93,500 to $126,500
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work: A. The Contractor shall furnish all labor, materials, equipment and incidental services necessary to perform all work associated with the Porch Replacement and Roof on Park Residence P-09, Bear Mountain State Park B. The Scope of Work shall include, but will not be limited to: 1. The removal of the existing covered porch structure and foundation to 1' below grade, and removal of the existing asphalt shingle roof. 2. Construction of the new porch according to the plans and specs. 3. Installation of a new asphalt shingle roof for the porch and entire house. C. Site Access/Construction Work Period Restrictions: 1. Snow removal/clearing: Park Road and driveway are plowed. Contrac tor is responsible for snow removal to access project site and progress the work as required. 2. Water and electrical service: There is water and electrical supply . D. Site cleanup and lawn restoration damaged by work.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents