Similar Projects
N Townsend Avenue Retail Development
New Construction, Infrastructure
Design
$2,479,611 CJ est. value
Montrose, CO 81401

Montrose County Jail - Addition/Renovation Project
Addition, Demolition, Renovation, Infrastructure
Bidding
$3,000,000 CJ est. value
Montrose, CO 81401

Tributary Street Extension
Infrastructure
Bidding
$300,000 CJ est. value
Montrose, CO 81401

Black Canyon Boys and Girls Club / Montrose
New Construction, Infrastructure - 18,500 SF
Post-Bid
$4,900,000 CJ est. value
Montrose, CO 81401

Black Canyon Boys and Girls Club / Montrose
New Construction, Infrastructure - 18,500 SF
Post-Bid
$4,900,000 CJ est. value
Montrose, CO 81401

Montrose Regional Health Ambulatory Care Center
New Construction, Infrastructure - 80,000 SF
Pending Verification
$43,000,000 CJ est. value
Montrose, CO 81401

Nucla Affordable Housing Development
New Construction, Infrastructure
Pending Verification
$5,600,000 CJ est. value
Nucla, CO 81424

RFP Design - South 3rd Electric Vehicle Charging Station
Infrastructure
Bidding
$150,000 CJ est. value
Montrose, CO 81401

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Ridgway Water Treatment Plant - Project 7 Water Authority
Infrastructure
Pending Verification
$50,000,000 CJ est. value
Montrose, CO 81401

RFP Design - Public Works Facility and Rio Grande Extension Design
Addition, New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Montrose, CO 81401

6700 Road Extension Project
Infrastructure
Post-Bid
$291,300 CJ est. value
Montrose, CO 81401

Trails at Cobble Creek
New Construction, Infrastructure
Pending Verification
$80,000,000 CJ est. value
Montrose, CO 81403

Montrose SC SAA - Aquatics Storage Building Extension
Addition, Demolition, Renovation, Infrastructure - 672 SF
Bidding
$80,000 CJ est. value
Montrose, CO 81401

2022 Water System Improvements
Infrastructure
Post-Bid
$250,000 est. value
Naturita, CO

Last Updated 01/03/2024 10:03 AM
Project Title

Southeast Water Transmission Main Construction Project

Physical Address View project details and contacts
City, State (County) Montrose, CO 81401   (Montrose County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2022
Bids Due View project details and contacts
Estimated Value $3,228,068 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

21144 The City of Montrose is requesting formal bids through the Invitation for Bid process to complete the Southeast Water Transmission Main Construction Project. This project will include the construction of approximately 1.8 miles of 24" HDPE waterline between Sunnyside and East Oak Grove Roads. The City reserves the right to accept or reject any or all bids, to waive irregularities and/or informalities and to disregard all non-conforming, non-responsive, unbalanced or conditional bids. The City of Montrose complies with all Equal Opportunity requirements. All qualified bidders will receive consideration without regard to race, creed, color, national origin, sex, marital status, religion, ancestry, mental or physical handicap or age. The project is also bid according to the City of Montrose local preference policy in effect on the date of the bid opening and detailed in the official Municipal Code of the City of Montrose, Section 1-16-4(B). Addenda will be posted to the website and it is the bidder's responsibility to download, review, sign, and include addenda with their bid. The project consists of furnishing all labor, equipment, and materials necessary to complete construction of the Southeast Water Transmission Main Construction Project in accordance with the project plans and specifications. This includes, but is not limited to, the following key tasks: A. Pothole existing utility crossings and work with with City to finalize the pipeline's vertical and horizontal alignment (see Section 1.5). B. Perform removals for the project to include asphalt pavement and concrete work as required to accommodate new construction. C. Construct a new 24" HDPE water transmission main to include mainline, tie-ins, thrust collars, air release assemblies, combination air valves, butterfly valves, remote-controlled butterfly valves, flow meters, and a fire hydrant. D. Relocate conflicting water, sewer, and dry utilities along the pipeline alignment as necessary. E. Perform asphalt patching and site restoration of right of way/park improvements. F. Implement stormwater management (incl. stormwater management plan), traffic control (incl. preparation of traffic control plans), site security, site restoration, final grading, and quality control testing as necessary to complete the work.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents